FIR14-00721
| INSP-Sprinkler Rough-in | 10/8/2014 | 10/8/2014 | 10/8/2014 3:36:34 PM | P | PASS |
|
|
See the city approved plans for location of one of the two in building risers that has been installed and is ok to cover
|
FIR14-00471
| INSP-Sprinkler Rough-in | 10/8/2014 | 10/8/2014 | 10/8/2014 3:29:46 PM | P | PASS |
|
|
Rough-in passed on the existing piping area. Piping can be covered.
|
FIR14-00533
| INSP-Sprinkler Rough-in | 10/7/2014 | 10/8/2014 | 10/8/2014 2:45:36 PM | P | PASS |
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has been performed.
|
BLD14-02865
| FIRE-Final Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 2:44:25 PM | P | PART |
|
|
Temporary occupancy per scope of work for Fire is approved. Owner has already started installing air lines and an air compressor.
|
FIR14-00494
| INSP-Final Inspection | 10/7/2014 | 10/8/2014 | 10/8/2014 2:05:24 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00607
| INSP-Final Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 2:02:46 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00466
| INSP-Supply line flush | 10/7/2014 | 10/8/2014 | 10/8/2014 2:02:17 PM | P | PASS |
|
|
Underground supply line flush passed
|
FIR14-00464
| INSP-Supply line flush | 10/7/2014 | 10/8/2014 | 10/8/2014 10:29:34 AM | A | PASS |
|
|
Underground flush passed
|
BLD14-02095
| FIRE-Conference | 10/7/2014 | 10/8/2014 | 10/8/2014 9:53:46 AM | A | DONE |
|
|
I verified that the insulation was being installed in the entire space for the overbuild where the anti-freeze system has been removed and fire stopped to less that 1,000 cublc feet per compartment. Keith Phone #: ###-####
|