Inspections for the day of: Monday, October 8, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03738 Permanent Service10/2/201810/8/201810/8/2018 2:38:50 PMPCANC
Arron Phone #: ###-#### Service is already energized. Contractor will call in when ready for a final.
ELE18-00803 Electrical Rough-In10/8/201810/8/201810/8/2018 2:18:14 PMPPASS
Kevin Phone #: ###-#### Ok cover ADU.
ELE18-03842 Final10/5/201810/8/201810/8/2018 1:36:18 PMANH
Robert Phone #: ###-####
ELE18-02266 Conference10/8/201810/8/201810/8/2018 1:33:16 PMPCANC
Russ Wrong address listed. Called contractor with said permit. He said he did not have an inspection called in, and doesnt know a Russ.
ELE18-03816 Electrical Rough-In10/8/201810/8/201810/8/2018 1:14:30 PMPPASS
call for access- Richard Phone #: ###-#### Ok cover.
ELE18-03816 Permanent Service10/8/201810/8/201810/8/2018 1:14:10 PMPCANC
call for access- Richard Phone #: ###-#### Need to raise overhead. Drip loop of 18" is required above roof.
ELE18-01558 Final10/5/201810/8/201810/8/2018 1:13:11 PMAPART
3rd and 4th floor final Phone #: ###-#### Inspection requested via web by steve cooper Partial 3-4 floors only.
ELE12-00588 ELE-Aging Inspection10/8/201810/8/201810/8/2018 11:03:39 AM DONE
Please call with progress on job.
ELE18-02588 Final10/5/201810/8/201810/8/2018 10:11:46 AMAPASS
Garage code POOL Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok final.
ELE18-03784 Rough-In Permanent Service10/5/201810/8/201810/8/2018 9:38:29 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk p/s u/g n ok
ELE18-03787 Permanent Service10/6/201810/8/201810/8/2018 8:58:28 AMAPASS
Replaced riser wires on overhead service. Primary wires were cut/disconnected prior to owner calling me. Lock box is on back door for entry. Code 1560 Phone #: ###-#### Inspection requested via web by Greg Traudt 2 ground rods were verified as per contractor. Contractor needs power on the verify house power throughout. p/s o/h rec ok