ELE19-03839 Electrical Rough-In10/7/201910/8/201910/8/2019 2:45:31 PMPPASS
Inspect = I opened-up the floor, to extend branch circuits ; install a new circuit.
The ceiling is open where the fire place was removed ; I extended branch circuits.

I will be there.
Thank you,
Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta
Wall removed separating living area from dining area. All junction boxes in attic had covers in place at rough in. Will have all new switches and receptacles for living and kit. Kitchen island will be new with rest of kitchen layout remaining original.
Kitchen and living areas rough in ok cover
ELE19-03844 Permanent Service10/8/201910/8/201910/8/2019 1:41:09 PMPFAIL
service off for a year
lock box 6290 Phone #: ###-#### Inspection requested via web by Greg Idsinga
230.27- Service mast shall be securely mounted in place. Upper strap secured to a place of siding that has started to lift off house.
230.62- Panel cover shall be secured in place. No screw holding panel cover in place.
300.15- All conductor splices shall be contained in a box. Due to multiple open splices in range wire in crawl space either install a box at each splice point or replace with new wire.
ELE19-03838 Temporary Service10/7/201910/8/201910/8/2019 11:10:35 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE19-03837 Temporary Service10/7/201910/8/201910/8/2019 11:09:59 AMAPASS
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
ELE19-03836 Electrical Rough-In10/7/201910/8/201910/8/2019 10:28:55 AMAPASS
Please call prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz
Master bathroom floor heat rough in ok cover
ELE19-03759 Electrical Rough-In10/7/201910/8/201910/8/2019 9:43:51 AMAPASS
Rough/Cover Phone #: ###-#### Inspection requested via web by Steven Ragan
Will require concrete of equivalent on east side of hot tub due to shallow depth of conduit.
Under ground and bonding conductor from pool to equipment rough in ok cover
ELE19-02541 Electrical Rough-In10/8/201910/8/201910/8/2019 9:02:22 AMAPASS
wall rough in.
Jake is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen
BCC-05-23- It shall be unlawful to cover in any way any electrical wiring or equipment without same first being inspected by electrical inspector prior. Small area area for an office and bathrooms one sided and lid covered. This is the only area this will be allowed to remain. Future cover in any way in future will have to be removed completely.