ELE19-03474
| Electrical Rough-In | 10/8/2019 | 10/8/2019 | 10/8/2019 3:01:25 PM | P | PASS |
|
|
underground inspection. Phil is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen Conduits ran Along Street / sidewalk. ok to cover
|
ELE19-03834
| Conference | 10/7/2019 | 10/8/2019 | 10/8/2019 2:42:03 PM | P | PASS |
|
|
Prefer after 2pm if possible Phone #: ###-#### Inspection requested via web by Paul Stewart talked about moving a/c disc. Conduit will be ran 18in under pavers. A/C is 23.5A min and 40A max. 10awg in conduit to new disc. location. owner has done work before and is aware of inspection process
|
ELE19-01948
| Permanent Service | 10/8/2019 | 10/8/2019 | 10/8/2019 1:52:54 PM | P | PART |
|
|
Service inspection and review areas that are complete and ready for occupancy Phone #: ###-#### Inspection requested via web by Jason Parke 110.26C3. Personnel doors. Where equipment rated 800A or more that contain overcurrent devices. Personel doors shall open in the direction of egress and be equiped with listerd panic hardware.. (Bus duct electrical room.) NE and SE area cubicals checked and ready for final.
|
ELE19-01784
| Electrical Rough-In | 10/8/2019 | 10/8/2019 | 10/8/2019 12:45:08 PM | P | PASS |
|
|
light pole bases // Mark Phone #: ###-#### 4 pole bases only ok to cover
|
ELE19-03817
| Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 11:31:46 AM | A | PASS |
|
|
street light conduit, cage and grounding inspection prior to concrete. Phone #: ###-#### Inspection requested via web by michael hunt Pole base only ok to cover
|
ELE19-03744
| Rough-In Permanent Service | 10/8/2019 | 10/8/2019 | 10/8/2019 11:15:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok p/s u/g n ok
|
ELE19-03743
| Rough-In Permanent Service | 10/8/2019 | 10/8/2019 | 10/8/2019 11:14:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough in ok p/s u/g n ok
|
ELE19-01631
| Final | 10/7/2019 | 10/8/2019 | 10/8/2019 10:26:19 AM | A | NR |
|
|
If you can give me a heads up. Around 30 minutes prior before heading over I will have somebody meet you there. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Not ready. Spoke to contractor. Needed to install breaker lockout and AFCI recep for master bedroom.
|
ELE19-03420
| Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 9:18:13 AM | A | PASS |
|
|
phase 2 // Jose Phone #: ###-#### IT room wall and open office area wals only. OK to replace ceiling tiles
|
ELE19-03474
| Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 8:58:17 AM | A | PASS |
|
|
electrical rough in and under ground. Phil is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen Exterior egress lighting only ok to cover
|
ELE19-03833
| Conference | 10/7/2019 | 10/8/2019 | 10/8/2019 8:41:28 AM | A | NR |
|
|
Daniel Phone #: ###-#### Was onsite at 8:40am. No body home. No answer.
|
ELE19-03738
| Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 12:00:00 AM | P | CANC |
|
|
Contact is Brian Prussia. The install starts at 12 if the inspector can come between 2-4 that would be the best. Thank you!! Phone #: ###-#### >> Inspection requested via web by BRS Permitting
|