Inspections for the day of: Wednesday, October 9, 1996.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC95-01842 INSP - Final10/9/199610/9/199610/10/1996 12:00:00 AMPFAIL
10/09/96 350 - CORRECTIONS ON POOL HEATER ROOM, GAS PIPING NOT FINISHED
MEC95-01842 INSP - Final10/9/199610/9/199610/10/1996 12:00:00 AMPFAIL
10/09/96 350 - CORRECTIONS ON POOL HEATER ROOM, GAS PIPING NOT FINISHED
MEC95-02095 INSP - Final10/9/199610/9/199610/10/1996 12:00:00 AMPPASS
10/09/96 350 - FINAL FOR WHOLE BUILDING OK
MEC95-02095 INSP - Final10/9/199610/9/199610/10/1996 12:00:00 AMPPASS
10/09/96 350 - FINAL FOR WHOLE BUILDING OK
BLD1055917 INSP - Letter of compliance10/9/199610/9/199610/9/1996 12:00:00 AM PASS
/ / 350 - C/C11909
BLD1055917 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AM PASS
/ / 350 - CORRECTIONS MADE FINAL
BLD1055917 INSP - Letter of compliance10/9/199610/9/199610/9/1996 12:00:00 AM PASS
/ / 350 - C/C11909
BLD1056421 INSP - Energy code compliance10/9/199610/9/199610/9/1996 12:00:00 AM PASS
/ / 350 - INSULATION OK, OK TO COVER
BLD95-01806 INSP - Final10/8/199610/9/199610/9/1996 12:00:00 AMPNH
10/09/96 350 - HOUSE LOCKED UP, LEFT NOTICE
BLD96-02359 INSP - Footings10/8/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - CHECK ENGINEERED FOOTING... TALKED WITH CONCRETE MAN HE HAS PICTURES OF THE STEEL IN PADS FOR COLUMN PADS ARE POURED BUT WHERE STILL EXPOSED
BLD96-02645 INSP - Foundation10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - THIS IS AN EARLY START FOR FOOTINGS AND FOUNDATIONS-- NEV INSPECTION FTNS POURED SETBACKS OK 5 FT EACH SIDE WANTS IT AS LATE AS POSSIBLE
BLD96-02671 INSP - Footings10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - SETBACKS OK FTNS POURED
BLD96-02676 INSP - Footings10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - FTNS OK SETBACKS OK FTNS POURED, THIS HOUSE FACES DEVONWO
BLD1056421 INSP - Energy code compliance10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - OK
MEC96-02405 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AMPFAIL
10/09/96 350 - reinspection $42 REINSPECTION FEE, CORRECTIONS NOT FINISHED FROM 10/4
MEC96-02405 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AMPFAIL
10/09/96 350 - reinspection $42 REINSPECTION FEE, CORRECTIONS NOT FINISHED FROM 10/4
MEC96-02519 INSP - Final10/8/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - FINAL OK
MEC96-02519 INSP - Final10/8/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - FINAL OK
MEC96-02520 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - FINAL OK
MEC96-02520 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - FINAL OK
MEC96-02864 INSP - Gas pressure test10/9/199610/9/199610/9/1996 12:00:00 AMPPASS
10/09/96 350 - P/T OK FOR WHOLE HOUSE #32994
MEC96-02945 INSP - Rough-in & Gas Pressure10/8/199610/9/199610/9/1996 12:00:00 AMPCANC
10/09/96 350 - TO BE DONE BY #342
MEC96-02948 INSP - Gas pressure test10/8/199610/9/199610/9/1996 12:00:00 AMPFAIL
10/09/96 350 - FOUR PLEX NO ADDRESS NO INSPECTION DONE
MEC96-02950 INSP - Framing/ Rough-in10/9/199610/9/199610/9/1996 12:00:00 AMPCANC
10/09/96 350 - TO BE DONE BY #337
MEC96-02950 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AMPCANC
10/09/96 350 - TO BE DONE BY #337
MEC96-02950 INSP - Final10/9/199610/9/199610/9/1996 12:00:00 AMPCANC
10/09/96 350 - TO BE DONE BY #337
MEC96-02961 INSP - Framing/ Rough-in10/9/199610/9/199610/9/1996 12:00:00 AMPCANC
10/09/96 350 - YMC JOB # C335\YMC CONTACT ROB MARCUM\OFFICE ###-####\ TO BE DONE BY #337