Inspections for the day of: Thursday, October 9, 1997.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-00447 INSP - Framing/Rough-in10/9/199710/9/199710/10/1997 12:00:00 AMPCANC
10/09/97 407 - cancelled .
BLD97-00437 INSP - Letter of compliance10/9/199710/9/199710/9/1997 12:00:00 AM PASS
/ / 407 - LC#14022
BLD97-00437 INSP - Letter of compliance10/9/199710/9/199710/9/1997 12:00:00 AM PASS
/ / 407 - LC#14022
BLD97-02359 INSP - Framing/Rough-in10/9/199710/9/199710/9/1997 12:00:00 AM PASS
/ / 407 - re-inspect.
BLD97-02359 INSP - Energy code compliance10/8/199710/9/199710/9/1997 12:00:00 AMAPASS
10/09/97 407 - Scheduled by Hello! on 10/08/97 at 14:18:30.
BLD97-01628 INSP - Framing/Rough-in10/9/199710/9/199710/9/1997 12:00:00 AMPCANC
10/09/97 407 - ceiling > Talked with greg coman he did not call for a ce
BLD97-02318 INSP - Framing/Rough-in10/9/199710/9/199710/9/1997 12:00:00 AMPNR
10/09/97 407 - not ready no plans or truss details also gas pipe has not rogh-in not complete,hvac still on site.
BLD97-00437 INSP - Final10/8/199710/9/199710/9/1997 12:00:00 AMPPASS
10/09/97 407 -
MEC97-02400 INSP - Final10/9/199710/9/199710/9/1997 12:00:00 AMPFAIL
10/09/97 407 - need to do some insulating.
MEC97-02400 INSP - Final10/9/199710/9/199710/9/1997 12:00:00 AMPFAIL
10/09/97 407 - need to do some insulating.
MEC97-02806 INSP - Rough-in & Gas Pressure10/9/199710/9/199710/9/1997 12:00:00 AMPPART
10/09/97 407 - CALL BRENT ###-#### gas test ok left correction for R-I.
BLD97-02491 INSP - Framing/Rough-in10/8/199710/9/199710/9/1997 12:00:00 AMPFAIL
10/09/97 407 - left corrections ok to insulate.