ELE00-03918
| Final | 10/6/2000 | 10/9/2000 | 10/9/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 14:14:28. Contact: ###-####. did not see ground work 10/9/2000 2:13:28 PM
|
ELE00-03860
| Final | 10/8/2000 | 10/9/2000 | 10/9/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/08/2000 at 23:08:06. Contact: ###-####. no inspection on wiring called for 10/9/2000 10:40:25 AM
|
ELE00-03923
| Final | 10/9/2000 | 10/9/2000 | 10/9/2000 12:00:00 AM | P | PASS |
|
|
FN MILLER ###-####
|
ELE00-03924
| Final | 10/9/2000 | 10/9/2000 | 10/9/2000 12:00:00 AM | P | FAIL |
|
|
FN INSP MILLER ###-#### 680-25 insulated grd 10/9/2000 2:12:39 PM
|
ELE00-03919
| Electrical Rough-In | 10/6/2000 | 10/9/2000 | 10/9/2000 12:00:00 AM | P | PASS |
|
|
pool bonding ###-####
|