BLD01-01600
| BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PART |
|
|
###-#### charlie ###-#### charlie hip ridge hangers to be secured at ceilling insp. 10/9/2001 3:55:53 PM
|
BLD01-01915
| BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | NR |
|
|
fr insp- dee- ###-####
|
BLD01-01648
| BLD-Final | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PASS |
|
|
gene ###-#### please call first final ok / ok to sign off upon others sign for perm. oc 10/9/2001 8:54:20 AM
|
BLD00-01894
| BLD-Foundation | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 17:15:07. Contact: ###-####. east roadway back fill and retaining wall ft ok special insp on site. rebar on bridge deck in progess. engineer to address dope psi loading being crushed under rebar loading will be replaced. followed through special insp with rfi pending./ wating for ducts for pt profils. 10/9/2001 11:46:08 AM
|
BLD00-02920
| BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 07:39:40. Contact: ###-####. c/n posted. 10/10/2001 3:38:11 PM
|
BLD97-00889
| BLD-Final | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 11:07:21. Contact: ###-####. romex wire/c/n wyane 10/10/2001 3:43:59 PM
|
BLD97-00956
| BLD-Final | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 11:08:45. Contact: ###-####. l/c ok card on site. 10/10/2001 3:43:06 PM
|
BLD00-03428
| BLD-Foundation | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PART |
|
|
###-#### kalven center wall sec. north side of project ok pending special insp report for concrete. 10/9/2001 1:52:42 PM
|