BLD99-03148
| BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 10/9/2001 8:45:19 AM w/GS...chimney/grease duct to be evaluated by Creighton Eng'g, keep c/n...do not occupy 2nd floor
|
BLD00-02175
| BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 10/9/2001 8:43:48 AM w/ GS re meeting w/ Ken Howell & Dave Miller...chimney/grease duct to be evaluated by Creighton Eng'g...keep c/n
|
BLD01-02659
| BLD-Final | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PART |
|
|
###-####...roof appears ok, all ready installed 10/9/2001 9:02:39 AM
|
BLD01-00531
| BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | NR |
|
|
fr insp -scott ###-####
|
BLD01-00000
| BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | NR |
|
|
fr insp -scott ###-####
|
BLD00-01649
| BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 340 On 10/8/2001 5:15:35 PM 2nd fl courts, Lee ###-#### court grids ok pend elec...complete firestops at corridor roomsides prior to tiles. reinsp req'd. Keep c/n. 10/9/2001 4:54:56 PM
|
MEC01-01649
| Final | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01092
| BLD-Final | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
###-####, c/n smoke dets, handrail & landing at deck 10/9/2001 5:56:47 PM
|
MEC01-03007
| Pressure Test | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 11:27:01. Contact: ###-####. by gas co. 10/9/2001 4:57:11 PM
|
MEC01-03007
| Final | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 11:27:16. Contact: ###-####. c/n flex-ducts at gar...comb air at w.htr. 10/9/2001 5:00:43 PM
|
BLD01-00231
| BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/9/2001 2:35:34 PM w/ Rick Jackson ...need final, agreement for alarms.
|
BLD01-02267
| BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/9/2001 2:37:00 PM keep c/n, rec'd resubmittal, need clarify prop. lines or right -of-way.
|
BLD01-00808
| BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/9/2001 5:04:22 PM reviewed submittal w/ bldr, vents ok as thru penetrations if n.c. & stopped at floor in walls
|