PLM01-02134
| Final | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 14:25:46. Contact: ###-####.
|
PLM01-02919
| Final | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 22:18:40. Contact: ###-####. pex tubing shall not be installed within first 18 inches of water heater connection ( upc 604.11.2 ) 10/9/2001 11:38:16 AM
|
PLM01-03459
| Groundwork | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
###-#### need to hang vent piping every 4 feet. need cleanout on break sink also need to protect piping passing through concret. need to change combo to san tee for floor drain ( upc 1002.4 vent opening below weir of trap ) need to change pvc pipe gluded in to abs fitting to abs pipe on 4x6 abs combo called plumbing contractor about correction,s 10/9/2001 3:34:53 PM
|
PLM01-02770
| Final | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 08:41:08. Contact: ###-####.
|
PLM01-03469
| Sprinkler (Final) | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PART |
|
|
dennis-- ###-#### for backflow tie-in ok . ok to backfill contractor to recall when r.p. tested and certified 10/9/2001 1:51:08 PM
|
PLM01-03426
| Plumbing Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PASS |
|
|
###-####
|