BLD01-00342
| BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | FAIL |
|
|
###-####
c/n posted 10/9/2001 1:32:02 PM
|
BLD01-01014
| BLD-Foundation | 10/8/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 15:55:33. Contact: ###-####.
|
BLD01-02316
| BLD-Foundation | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PART |
|
|
###-####
north and east basment walls wip and extra #5 rebar horizontals ok pending eng. letter on beam pockets ? per verbal w/ owner 10/9/2001 2:18:37 PM
|
BLD01-01834
| BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
###-####--shear nail 10/9/2001 9:07:28 AM
c/n posted 10/10/2001 10:33:45 AM
|
BLD01-00342
| BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | FAIL |
|
|
reinspect frame 10/9/2001 9:53:33 AM
not open 10/9/2001 2:21:49 PM
|
BLD00-03720
| BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 12:00:00 AM | P | PART |
|
|
###-#### MIKE SHEER NAIL OUT SIDE ONLY
c/n on nailing 10/10/2001 10:29:34 AM
|