Inspections for the day of: Wednesday, October 9, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02033 Plumbing Rough-in10/8/200210/9/200210/9/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/08/2002 at 22:32:02. Contact: ###-####. 229 and 235 ri ok 10/9/2002 1:43:19 PM
PLM02-02033 Final10/8/200210/9/200210/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 10/08/2002 at 22:33:40. Contact: ###-####.
PLM02-00906 Storm Drains10/9/200210/9/200210/9/2002 12:00:00 AMAFAIL
called to see 3" rd test in the rotunda, LEAKS
PLM02-03078 Sprinkler (Final)10/9/200210/9/200210/9/2002 12:00:00 AMPFAIL
###-####- terria 2 unions required 10/9/2002 2:49:45 PM
PLM02-03079 Water and/or Sewer10/9/200210/9/200210/9/2002 12:00:00 AMPPASS
###-####
PLM02-00906 Roof Drains10/9/200210/9/200210/9/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/09/2002 at 09:07:46. Contact: ###-####. 3 inch rain drain east side rotundra test ok 10/9/2002 2:24:15 PM
PLM02-01686 Final10/8/200210/9/200210/9/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/08/2002 at 13:49:12. Contact: ###-####. janitor sink needs avb, open control box for whirlpool tub, air gap required on water heater t&p. 10/9/2002 4:03:50 PM
PLM02-01890 Final10/8/200210/9/200210/9/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/08/2002 at 13:50:05. Contact: ###-####. janitor sink needs avb, open control box for whirlpool tub, air gap required on water heater t&p drain, install shower head west end. 10/9/2002 4:07:28 PM