BLD01-02961
| BLD-Final | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD02-01578
| BLD-Final | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | A | PASS |
|
|
access code 7693 ###-####
|
BLD02-01765
| BLD-Energy code compliance | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02435
| Final | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 16:14:14. Contact: ###-####.--gar door door is 7693
|
MEC02-02916
| Pressure Test | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | A | PASS |
|
|
30 minutes notice for access ###-####
|
MEC02-01910
| Final | 10/9/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 07:41:41. Contact: ###-####.6449 IS THE CODEunable to get into crawl space left c/n it might be covered by carpet. 10/9/2002 4:02:52 PM
|
BLD02-02030
| BLD-Framing/Rough-in | 10/9/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | FAIL |
|
|
###-####. rear door addition not bolted per detail interior framing ok.c/n posted. 10/9/2002 2:14:52 PM
|
BLD02-00489
| BLD-Framing/Rough-in | 10/9/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | PART |
|
|
ken--for a partial; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD01-02802
| BLD-Conference | 10/9/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | PART |
|
|
meet with contractor about truck roll down doors. 10/9/2002 3:00:37 PM
|
BLD02-02385
| BLD-Footing | 10/9/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | NR |
|
|
###-####
|
BLD02-02320
| BLD-Footing | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | PART |
|
|
before 4 pm ###-####. no plans or persons on site work is in progress set backs appear ok. 10/9/2002 4:03:33 PM
|
BLD02-02377
| BLD-Foundation | 10/8/2002 | 10/9/2002 | 10/9/2002 12:00:00 AM | P | PART |
|
|
###-####
|