Inspections for the day of: Wednesday, October 9, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02015 BLD-Framing/Rough-in10/8/200210/9/200210/9/2002 12:00:00 AMAPART
###-#### plans are in f\p box C/N ok to insulate. 10/9/2002 10:27:54 AM
BLD02-01577 BLD-Footing10/8/200210/9/200210/9/2002 12:00:00 AMAPART
###-#### No approved plans on site-appears ok--pour at own risk--rebar and forms set up. 10/9/2002 8:49:58 AM
MEC02-02744 Rough-in10/8/200210/9/200210/9/2002 12:00:00 AMAPASS
Fireplaces--Specs on fireplace exempts 1" clearance at front next to flange area. 10/9/2002 11:47:45 AM
BLD02-00175 BLD-Energy code compliance10/8/200210/9/200210/9/2002 12:00:00 AMAPASS
###-#### Air seal package completed. 10/9/2002 11:26:45 AM
BLD02-01607 BLD-Framing/Rough-in10/9/200210/9/200210/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/09/2002 at 06:50:31. Contact: . Prior c/n items completed including engineering on drag strut wall--ok to insulate. 10/9/2002 8:51:17 AM
BLD02-02159 BLD-Foundation10/9/200210/9/200210/9/2002 12:00:00 AMAPART
###-#### wip--5% ready 10/9/2002 9:56:52 AM
BLD02-01919 BLD-Energy code compliance10/9/200210/9/200210/9/2002 12:00:00 AMPFAIL
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Completion of insulation and vapor barrier needed. 10/9/2002 9:13:33 PM
BLD02-02378 BLD-Wall cover10/9/200210/9/200210/9/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/09/2002 at 11:25:59. Contact: . plumbing rough-in not passed; bathroom already covered. 10/9/2002 3:29:22 PM
BLD02-01991 BLD-Foundation10/8/200210/9/200210/9/2002 12:00:00 AMPPART
###-#### wip--rebar in place--85% ready. 10/9/2002 3:36:55 PM
BLD02-01446 BLD-Framing/Rough-in10/8/200210/9/200210/9/2002 12:00:00 AMPFAIL
###-#### C/N posted--Do not insulate--to many items need correcting. Correct and comply with correction notice and re-call. 10/9/2002 2:43:03 PM
BLD02-02255 BLD-Footing10/7/200210/9/200210/9/2002 12:00:00 AMPDONE
Scheduled by a contractor via Hello! on 10/07/2002 at 07:54:49. Contact: ###-####. Concrete inspection had already been done. 10/9/2002 9:13:59 PM