Inspections for the day of: Monday, October 9, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00471 INSP-Final Inspection10/6/200610/9/200610/9/2006 5:05:24 PMAPASS
Fire alarm work passed inspection, permit finaled.
FIR06-00648 INSP-Final Inspection10/9/200610/9/200610/9/2006 4:27:30 PMPPASS
Correction verified, permit finaled.
FIR06-00540 INSP-Sprinkler Rough-in/Hydro10/6/200610/9/200610/9/2006 4:26:41 PMPPART
OH rough-in is good for cover at the 2nd floor NE quadrant as marked on approved plans, hydrostatic test for this area also passed inspection.
FIR06-00588 INSP-Final Inspection10/9/200610/9/200610/9/2006 3:37:09 PMPPART
OH rough-in is okay to cover at the drop ceiling areas, one arm-over has an overspaced hanger which is to be relocated and verified for code compliance prior to final.
BLD06-01508 FIRE-Final Inspection10/9/200610/9/200610/9/2006 2:34:25 PMPPASS
Fire life safety passed final inspection.
BLD05-02015 FIRE-Final Inspection10/6/200610/9/200610/9/2006 2:19:25 PMPFAIL
The project related alarm and sprinkler permit work must be approved and finaled prior to BLD life safety final. Note: two alarm permits are attatched to this project.
FIR06-00064 INSP-Alarm Testing10/6/200610/9/200610/9/2006 2:17:20 PMAPART
Items tested today include complete sprinkler monitoring and notification and detection devices for the third floor only. Noted the first floor zone tamper and the standpipe control tamper are addressed as the same point, two duct detectors on the 3rd floor as noted on approved plans are poorly located and will require changed configuration or a magnehelic test, damper for ID 173 as marked on plans operates backwards, covers on some strobes were removed while on site. As builts for field mods have been provided. Inspection concluded after two hours on site due to time constraints, still need to test 1st and 2nd floors, verify signals, verifiy corrections for the 3rd floor as noted today.
FIR06-00648 INSP-Final Inspection10/6/200610/9/200610/9/2006 12:05:42 PMAFAIL
Wall mounted notification device in the east stock room is blocked by adjacent storage shelving, need to relocate to ensure proper coverage.
FIR05-00459 INSP-Final Inspection10/5/200610/9/200610/9/2006 10:56:56 AMACANC
Cancel per contractor due to access issues.
BLD06-02248 FIRE-Final Inspection10/6/200610/9/200610/9/2006 10:55:45 AMAFAIL
Sprinkler heads in the GSM office are overspaced off the new adjacent partition wall, area around the fire sprinkler riser must remain clear at all times, need to verify emergency lighting is provided per requirements of fire code review notes #8.
FIR06-00516 INSP-Final Inspection10/9/200610/9/200610/9/2006 10:08:37 AMPPASS
Fire alarm permit finaled.
BLD06-01943 FIRE-Final Inspection10/6/200610/9/200610/9/2006 10:01:46 AMAFAIL
One damper on the north side is non functional due to a smoke head equipment failure, need to repair and test prior to final.
BLD06-00731 FIRE-Final Inspection10/6/200610/9/200610/9/2006 9:58:24 AMAPASS
Fire life safety passed final inspection.
BLD06-01944 FIRE-Final Inspection10/6/200610/9/200610/9/2006 9:56:56 AMAPASS
Corrections are complete, life safety finaled.
FIR06-00516 INSP-Alarm Testing10/5/200610/9/200610/9/2006 9:55:28 AMAPASS
Items required for final have been verified for completion, inspection passed.