FIR06-00471
| INSP-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 5:05:24 PM | A | PASS |
|
|
Fire alarm work passed inspection, permit finaled.
|
FIR06-00648
| INSP-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 4:27:30 PM | P | PASS |
|
|
Correction verified, permit finaled.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 10/6/2006 | 10/9/2006 | 10/9/2006 4:26:41 PM | P | PART |
|
|
OH rough-in is good for cover at the 2nd floor NE quadrant as marked on approved plans, hydrostatic test for this area also passed inspection.
|
FIR06-00588
| INSP-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 3:37:09 PM | P | PART |
|
|
OH rough-in is okay to cover at the drop ceiling areas, one arm-over has an overspaced hanger which is to be relocated and verified for code compliance prior to final.
|
BLD06-01508
| FIRE-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 2:34:25 PM | P | PASS |
|
|
Fire life safety passed final inspection.
|
BLD05-02015
| FIRE-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 2:19:25 PM | P | FAIL |
|
|
The project related alarm and sprinkler permit work must be approved and finaled prior to BLD life safety final. Note: two alarm permits are attatched to this project.
|
FIR06-00064
| INSP-Alarm Testing | 10/6/2006 | 10/9/2006 | 10/9/2006 2:17:20 PM | A | PART |
|
|
Items tested today include complete sprinkler monitoring and notification and detection devices for the third floor only. Noted the first floor zone tamper and the standpipe control tamper are addressed as the same point, two duct detectors on the 3rd floor as noted on approved plans are poorly located and will require changed configuration or a magnehelic test, damper for ID 173 as marked on plans operates backwards, covers on some strobes were removed while on site. As builts for field mods have been provided. Inspection concluded after two hours on site due to time constraints, still need to test 1st and 2nd floors, verify signals, verifiy corrections for the 3rd floor as noted today.
|
FIR06-00648
| INSP-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 12:05:42 PM | A | FAIL |
|
|
Wall mounted notification device in the east stock room is blocked by adjacent storage shelving, need to relocate to ensure proper coverage.
|
FIR05-00459
| INSP-Final Inspection | 10/5/2006 | 10/9/2006 | 10/9/2006 10:56:56 AM | A | CANC |
|
|
Cancel per contractor due to access issues.
|
BLD06-02248
| FIRE-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 10:55:45 AM | A | FAIL |
|
|
Sprinkler heads in the GSM office are overspaced off the new adjacent partition wall, area around the fire sprinkler riser must remain clear at all times, need to verify emergency lighting is provided per requirements of fire code review notes #8.
|
FIR06-00516
| INSP-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 10:08:37 AM | P | PASS |
|
|
Fire alarm permit finaled.
|
BLD06-01943
| FIRE-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 10:01:46 AM | A | FAIL |
|
|
One damper on the north side is non functional due to a smoke head equipment failure, need to repair and test prior to final.
|
BLD06-00731
| FIRE-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 9:58:24 AM | A | PASS |
|
|
Fire life safety passed final inspection.
|
BLD06-01944
| FIRE-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 9:56:56 AM | A | PASS |
|
|
Corrections are complete, life safety finaled.
|
FIR06-00516
| INSP-Alarm Testing | 10/5/2006 | 10/9/2006 | 10/9/2006 9:55:28 AM | A | PASS |
|
|
Items required for final have been verified for completion, inspection passed.
|