MIS06-00255
| FIR-Final | 10/9/2006 | 10/9/2006 | 10/9/2006 4:31:42 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00463
| INSP-Sprinkler Rough-in/Hydro | 10/6/2006 | 10/9/2006 | 10/9/2006 4:30:58 PM | A | PASS |
|
|
2nd floor sprinkler piping is ok to cover
|
FIR06-00685
| INSP-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 3:25:31 PM | P | PASS |
|
|
permit finaled
|
FIR05-00368
| INSP-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 3:21:19 PM | P | PASS |
|
|
permit finaled
|
FIR05-00338
| INSP-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 3:20:43 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00627
| INSP-Final Inspection | 10/9/2006 | 10/9/2006 | 10/9/2006 2:08:12 PM | P | FAIL |
|
|
Repair the outside bell and relocate/test the smoke detector located at the fire alarm panel.
|
FIR05-00574
| INSP-Sprinkler Rough-in/Hydro | 10/9/2006 | 10/9/2006 | 10/9/2006 2:06:53 PM | P | FAIL |
|
|
Provide atleast 8ah batteries, provide approved plans and finish elevator interconnection and test.
|
BLD06-00830
| FIRE-Final Inspection | 10/4/2006 | 10/9/2006 | 10/9/2006 12:07:27 PM | A | PASS |
|
|
life safety finaled
|
FIR06-00231
| INSP-Final Inspection | 10/4/2006 | 10/9/2006 | 10/9/2006 12:06:20 PM | A | PASS |
|
|
permit finaled
|
FIR06-00126
| INSP-Supply line flush | 10/9/2006 | 10/9/2006 | 10/9/2006 12:00:05 PM | P | FAIL |
|
|
United Water has not turned on the underground supply water yet. Flush not performed
|
FIR06-00700
| INSP-Final Inspection | 10/6/2006 | 10/9/2006 | 10/9/2006 11:39:33 AM | P | PASS |
|
|
Hood suppression system operated correctly. It is not connected to the alarm system yet.
|
BLD06-01550
| FIRE-Final Inspection | 10/3/2006 | 10/9/2006 | 10/9/2006 10:26:00 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00693
| INSP-Final Inspection | 10/3/2006 | 10/9/2006 | 10/9/2006 10:16:14 AM | A | PASS |
|
|
permit finaled
|
FIR06-00373
| INSP-Final Inspection | 10/3/2006 | 10/9/2006 | 10/9/2006 10:15:38 AM | A | PASS |
|
|
permit finaled
|