Inspections for the day of: Thursday, October 9, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00606 INSP-Final Inspection10/8/200810/9/200810/9/2008 4:54:10 PMPPART
Escutcheons at the auditorium and classroom A106 have been installed, missing one canopy at the south side vestibule.
BLD08-01106 FIRE-Final Inspection10/9/200810/9/200810/9/2008 4:51:23 PMPPASS
Previous C/N items are finished, noted three exit signs at the east side above doors leading into outside pen enclosures to be removed per review comments and plan revision prior to structural final inspection as agreed.
FIR08-00553 INSP-Final Inspection10/8/200810/9/200810/9/2008 4:48:22 PMPPASS
Noted correction items field verified for compliance, fire alarm permit finaled.
FIR07-00827 INSP-Sprinkler Rough-in10/9/200810/9/200810/9/2008 4:47:10 PMPPART
OH fire sprinkler system modifications are good for cover at the drop ceilings in the stretcher prep/storage room. See red lined areas on stamped plan set for locations approved.
FIR08-00491 INSP-Sprinkler Rough-in/Hydro10/9/200810/9/200810/9/2008 1:48:51 PMPFAIL
Trapeeze hangers at the lower level branch lines in the south office and delivery rooms are not approved (sidewinder sammys in the narrow dimention), discussed main and branchline changes to be shown on resubmittals prior to project final. See stamped plan set for location inspected today.
FIR08-00438 FIR-Aging Inspection10/9/200810/9/200810/9/2008 1:39:30 PM DONE
Work in progress, construction underway.
FIR08-00612 INSP-Sprinkler Rough-in/Hydro10/8/200810/9/200810/9/2008 1:38:53 PMAPART
OH hydrostatic testing for the 1st, 2nd and 3rd floor piping completed acceptable.