BLD08-02078
| BLD-Final | 10/9/2008 | 10/9/2008 | 10/9/2008 5:49:40 PM | P | NR |
|
|
troy Phone #: ###-#### need f/l/s,, and electrical finals,, conf on phone to this
|
ESC08-00710
| Tracking Control | 10/9/2008 | 10/9/2008 | 10/9/2008 5:48:32 PM | P | PART |
|
|
a couple verbal corrections,, ok,, wip
|
ESC08-00424
| Site Final | 10/9/2008 | 10/9/2008 | 10/9/2008 4:36:08 PM | P | PASS |
|
|
|
ESC08-00840
| Tracking Control | 10/9/2008 | 10/9/2008 | 10/9/2008 4:34:54 PM | P | PASS |
|
|
|
BLD08-01016
| BLD-Final | 10/9/2008 | 10/9/2008 | 10/9/2008 4:34:05 PM | P | NR |
|
|
ERNIE Phone #: ###-#### on site conf,, need elec. and zoning,, ok after
|
BLD06-02139
| BLD-Final | 10/8/2008 | 10/9/2008 | 10/9/2008 3:32:11 PM | P | PART |
|
|
BRANDON Phone #: ###-#### conf only,, need zoning,, need handrails per code on inside,, NOTE,, this is a duplex and basement unit was not touched
|
BLD08-02107
| BLD-Foundation | 10/8/2008 | 10/9/2008 | 10/9/2008 12:24:57 PM | A | PASS |
|
|
gregg Phone #: ###-####
|
BLD08-01016
| BLD-Final | 10/8/2008 | 10/9/2008 | 10/9/2008 11:26:36 AM | A | NR |
|
|
ERNIE Phone #: ###-#### need elec. and zoning finals 1st
|
BLD08-01818
| BLD-Energy code compliance | 10/7/2008 | 10/9/2008 | 10/9/2008 11:14:10 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/7/2008 at 11:26:48 AM. Contact: ###-####. all ok now to cover
|
BLD07-00878
| BLD-Conference | 10/3/2008 | 10/9/2008 | 10/6/2008 11:38:58 AM | P | CANC |
|
|
Paul Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|