Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00529 Aging Inspection10/9/200810/9/200810/9/2008 4:09:00 PM DONE
ESC06-00529 DOC - Permit Finaled10/9/200810/9/200810/9/2008 4:08:47 PMPPASS
ESC06-00530 Aging Inspection10/9/200810/9/200810/9/2008 4:07:38 PM DONE
ESC06-00530 DOC - Permit Finaled10/9/200810/9/200810/9/2008 4:07:28 PMPPASS
ESC06-00525 Aging Inspection10/9/200810/9/200810/9/2008 4:06:12 PM DONE
ESC06-00525 DOC - Permit Finaled10/9/200810/9/200810/9/2008 4:06:03 PMPPASS
ESC06-00526 Aging Inspection10/9/200810/9/200810/9/2008 4:05:25 PM DONE
ESC06-00526 DOC - Permit Finaled10/9/200810/9/200810/9/2008 4:05:17 PMPPASS
ESC08-00464 Random Inspection10/9/200810/9/200810/9/2008 4:04:11 PMPFAIL
Need to clean up all sediment in the gutter pan and street area. Close off North access to any incoming and or out going traffic. Only Construction access for the phase of open up the final access.
Will re-inspect on 10/13/08
ESC08-00624 General Inspection10/6/200810/9/200810/9/2008 2:15:00 PMAFAIL
Discussed with rP over the slope in the back yard along the vinyl fence. Have told him that he needs to roptect in due to it being greater than 2%. Due to the phase of work they will be putting in a barrier where the gap is. Recommend some options that he could do to prevent any more sediment from eroading. He also told me if there is any sediment that reoaded into the property next to him that he will clean it up. Will re-inspect on 10/13/08.
ESC08-00411 General Inspection10/9/200810/9/200810/9/2008 1:45:16 PMPFAIL
Correction Notice:
1. Maintain and re-install silt fence in the front of the lot.
2. Provide additional bmp's in the access area of the lot. Also recommend check dams along the west aide of the lot due to the slope from the back of the lot.
3. Place all debris into to the trash container that has been provided.
Will re-inspect 10/10/08 PM.
ESC08-00828 Site Preparation10/9/200810/9/200810/9/2008 12:56:40 PMAFAIL
Verbal Notice
Protect storm drains thruogh out the whole project area with approved internal protection and in addition, all drains must have an external protection also. Wil re-inspect tomorrow 10/10/08 in the PM.
ESC08-00084 BMP Violation10/6/200810/9/200810/9/2008 11:06:07 AMAPART
Still need to do additional clean up on the hard surfaces. Protect or Remove stock piles on hard surface. Install external drain inlet protection in the driveway.
ESC08-00699 Random Inspection10/9/200810/9/200810/9/2008 9:48:56 AMAFAIL
Verbal Notice to RP. Must clean up by the end of the day.
1. Clean up a contaminated soil from the hydrolic leak form the rock trencher. If maintainence work on the equiptment is going to occur a spil kit and an absobent drop clothe will need to be provided.