Inspections for the day of: Friday, October 9, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00603 General Inspection10/9/200910/9/200910/9/2009 4:00:45 PMPPART
looked ok, didn't see sign
ELE09-01940 Electrical Rough-In10/9/200910/9/200910/9/2009 3:59:31 PMPPASS
John Edwards-underground inspection please Phone #: ###-#### ok to cover u/g house to garage, told contractor to add p/s to permit
ESC09-00503 Random Inspection10/9/200910/9/200910/9/2009 3:24:53 PMPPASS
ESC09-00506 Random Inspection10/9/200910/9/200910/9/2009 3:23:56 PMPPASS
ESC09-00505 Random Inspection10/9/200910/9/200910/9/2009 3:12:07 PMPPASS
ESC09-00504 Random Inspection10/9/200910/9/200910/9/2009 2:49:54 PMPPASS
ESC09-00547 Random Inspection10/9/200910/9/200910/9/2009 2:31:57 PMPPASS
ELE09-01766 Electrical Rough-In10/9/200910/9/200910/9/2009 1:31:41 PMPFAIL
ready for inspection, go in through garage, guys are working inside Phone #: ###-#### Internet Inspection Request from: gary batten called left correction notice, NEC 21.52(A)(1) shall provide receptacle in walls such that no point is over 6' from a receptacle, 300.4(A) shall provide nailplates when edge of bored hole is less than 1 1/4" from edge of framing member, BCC all boxes shall be installed, all make-up shall be done, shall add 6 rooms to permit, no esc this project
ELE09-01778 Final10/8/200910/9/200910/9/2009 11:38:42 AMPPASS
Internet Inspection Request from: MARK PINNEY ok to final, no esc this project, signed structural card
ELE09-01909 Final10/8/200910/9/200910/9/2009 10:09:08 AMAPASS
Mike.. need to get this finaled out.. SUP05 Phone #: ###-#### Internet Inspection Request from: Ken Heller ok to final, wiremold, no esc this project
ELE09-01933 Electrical Rough-In10/8/200910/9/200910/9/2009 9:31:47 AMAPASS
Don--Please call at least 30 mins prior to inspection Phone #: ###-#### ric ok, no esc this project
ELE09-01416 Final10/8/200910/9/200910/9/2009 8:29:22 AMAPASS
dave Phone #: ###-#### called contractor, ok to final, no card to sign, no esc this project