ESC09-00498
| Site Final | 10/9/2009 | 10/9/2009 | 10/9/2009 3:59:02 PM | P | PASS |
|
|
Final stabalization has been completed.
|
BLD09-01328
| BLD-Final | 10/9/2009 | 10/9/2009 | 10/9/2009 3:55:04 PM | P | PASS |
|
|
rustin Phone #: ###-####
|
BLD09-01328
| DOC - Permit Finaled | 10/9/2009 | 10/9/2009 | 10/9/2009 3:54:55 PM | P | PASS |
|
|
Letter of occ issued.
|
BLD09-01250
| BLD-Final | 10/8/2009 | 10/9/2009 | 10/9/2009 3:54:30 PM | P | NR |
|
|
Phone #: ###-####-Mick. Will reschedule for Monday.
|
BLD09-01551
| BLD-Energy code compliance | 10/9/2009 | 10/9/2009 | 10/9/2009 2:53:26 PM | P | PASS |
|
|
john Phone #: ###-####. Fireblocking was done as noted previously.
|
MIS09-00026
| BLD-Final | 10/8/2009 | 10/9/2009 | 10/9/2009 1:47:46 PM | P | PASS |
|
|
ron Phone #: ###-####
|
MIS09-00026
| DOC - Permit Finaled | 10/9/2009 | 10/9/2009 | 10/9/2009 1:47:37 PM | P | PASS |
|
|
All listed items have been repaired. Elec. to shed has ben disconnected. Final ok.
|
ESC07-01065
| Aging Inspection | 10/9/2009 | 10/9/2009 | 10/9/2009 11:47:30 AM | | DONE |
|
|
|
ESC07-01065
| DOC - Permit Expired | 10/9/2009 | 10/9/2009 | 10/9/2009 11:47:22 AM | A | PASS |
|
|
Permit has expired.
|
BLD09-00965
| BLD-Framing/Rough-in | 10/8/2009 | 10/9/2009 | 10/9/2009 11:18:50 AM | A | PART |
|
|
Jared-dry wall inspection please Phone #: ###-####. 5/8 type x rock for vertical exit enclosure.
|
ESC09-00613
| Site Preparation | 10/9/2009 | 10/9/2009 | 10/9/2009 10:32:39 AM | A | PART |
|
|
ESC permit sign and concrete washout pit hace been provided. Needs to install silt fence along east property line were excavated materila is stockpiled. c/n given to RP.
|
BLD06-02616
| BLD-Final | 10/9/2009 | 10/9/2009 | 10/9/2009 10:29:58 AM | A | PASS |
|
|
Ron Phone #: ###-####
|
BLD06-02616
| DOC - Permit Finaled | 10/9/2009 | 10/9/2009 | 10/9/2009 10:29:51 AM | P | PASS |
|
|
All work was completed and inspected. The only fascade work done was at the vanilla finish address and not the entire strip mall.
|
BLD09-01710
| BLD-Footing | 10/8/2009 | 10/9/2009 | 10/9/2009 10:12:54 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/8/2009 at 4:32:28 PM. Contact: ###-####. wip. Noted to contractor that excavation may not be deep enough. Concrete contractor shot elevation. Contractor will be able to get enough fill to get the nfrost depth. This may cause drainage issues with neighbors. Noted to contractor that after const is complete and the city gets any compliants due to excessive water in neighbors yards, that they will be required to fix any issues.
|
BLD09-01551
| BLD-Framing/Rough-in | 10/8/2009 | 10/9/2009 | 10/9/2009 9:43:11 AM | A | PASS |
|
|
john Phone #: ###-####. FRamiing ok. Needs to fireblock chase and furdowns. Will check on energy code.
|