MIS12-00277
| MEC-Conference | 10/5/2012 | 10/9/2012 | 10/12/2012 9:02:52 AM | A | PASS |
|
|
check to see if A-1 plumbing permit has pulled permit for job..a permit has been issued and job will be inspected
|
GCM12-00188
| GCM-Final | 10/8/2012 | 10/9/2012 | 10/9/2012 4:47:28 PM | P | NH |
|
|
###-####...i rescheduled this for wed am
|
MEC12-03503
| Pressure Test | 10/8/2012 | 10/9/2012 | 10/9/2012 4:39:15 PM | P | PASS |
|
|
Pressure Test inspecton please call on your way to job. Thanks Joe Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez...20lb gas ok
|
MEC12-03503
| Rough-in | 10/8/2012 | 10/9/2012 | 10/9/2012 4:38:32 PM | P | PASS |
|
|
Rough-In inspecton please call on your way to job. Thanks Joe Phone #: ###-#### >> Inspection requested via web by Jose Rodriguez
|
MEC12-03489
| Rough-in | 10/8/2012 | 10/9/2012 | 10/9/2012 4:37:22 PM | P | PASS |
|
|
Light test on grease duct Call Davie ###-#### >> Inspection requested via web by Dave DeChambeau..light test ok
|
MEC12-02655
| Final | 10/8/2012 | 10/9/2012 | 10/9/2012 3:01:32 PM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Doug Anderson...doug will reschedule
|
MEC12-03318
| Final | 10/8/2012 | 10/9/2012 | 10/9/2012 2:33:50 PM | A | PASS |
|
|
Please call Arlen Dowdy if there are any Problems or Question ###-#### Phone #: ###-#### >> Inspection requested via web by Arlen Dowdy
|
MEC12-03465
| Pressure Test | 10/8/2012 | 10/9/2012 | 10/9/2012 2:31:07 PM | A | PEND |
|
|
>> Inspection requested via web by Dustin Rich...waiting on required permits
|
MEC12-03520
| Rough-in | 10/8/2012 | 10/9/2012 | 10/9/2012 1:37:39 PM | A | PASS |
|
|
fireplace rough in and pressure test Phone #: ###-#### >> Inspection requested via web by David Petsche...r/i and 20lb gas to f/p
|
MIS12-00277
| MEC-Conference | 10/5/2012 | 10/9/2012 | 10/9/2012 12:18:51 PM | P | CANC |
|
|
duplicate
|
MEC12-02536
| Final | 10/8/2012 | 10/9/2012 | 10/9/2012 11:54:28 AM | A | NR |
|
|
OLEG Phone #: ###-####...need to attach this permit to the building permit on line..re-call when done
|
MEC12-02845
| Final | 10/8/2012 | 10/9/2012 | 10/9/2012 11:44:11 AM | A | PASS |
|
|
Air balance report on site..... Phone #: ###-#### >> Inspection requested via web by Robin Cox..job finaled
|
MIS12-00256
| MEC-Final | 10/8/2012 | 10/9/2012 | 10/9/2012 10:29:09 AM | A | PASS |
|
|
Larry Phone #: ###-####...no change in equipment...all gas flex connectors approved..all hoods are in working order
|