FIR12-00395
| INSP-Sprinkler Rough-in/Hydro | 10/9/2012 | 10/9/2012 | 10/9/2012 3:51:15 PM | P | PASS |
|
|
OH hydro test passed for building 11
|
FIR12-00483
| INSP-Sprinkler Rough-in/Hydro | 10/9/2012 | 10/9/2012 | 10/9/2012 3:29:56 PM | P | PASS |
|
|
See the city approved plans for areas where the sprinkler piping located above the hardlids can be covered. It appears that a plan modification may be needed to show the ceiling changes.
|
FIR12-00494
| INSP-Sprinkler Rough-in | 10/9/2012 | 10/9/2012 | 10/9/2012 3:07:04 PM | P | PASS |
|
|
See the city approved plans for additional areas where sprinkler piping can be covered. Also see areas marked in blue that require corrections including the addtion of a sprinkler pendant in the window display.
|
FIR12-00531
| INSP-Final Inspection | 10/8/2012 | 10/9/2012 | 10/9/2012 2:31:53 PM | A | PASS |
|
|
Permit finaled. Tim Frost is ok with no hydro test
|
BLD12-01611
| FIRE-Final Inspection | 10/8/2012 | 10/9/2012 | 10/9/2012 1:35:43 PM | A | FAIL |
|
|
Provide city approved plans and notes for inspection. I went ahead and did a walk through and noted overspaced sprinkler pendants and that the fire extinguisher needs to be mounted.
|
FIR12-00532
| INSP-Alarm Testing | 10/8/2012 | 10/9/2012 | 10/9/2012 11:51:39 AM | A | FAIL |
|
|
Plan modifications are needed to show the actual wall and fire alarm device layout. This includes the location of the remoter annunciator and the manual pull station. Also it appears that an additional strobe will be required due to cabinent position and two smoke detectors need to be relocated away from air diffusers as discussed. No testing was performed.
|
FIR12-00535
| INSP-Alarm Testing | 10/8/2012 | 10/9/2012 | 10/9/2012 11:48:01 AM | A | FAIL |
|
|
I verified the placement of the a/v's but the contractor did not want to test until the other FIR could be tested.
|
FIR12-00422
| INSP-Sprinkler Rough-in | 10/8/2012 | 10/9/2012 | 10/9/2012 10:32:54 AM | A | PASS |
|
|
Rough-in passed. Piping is ok to cover
|
FIR12-00087
| INSP-Final Inspection | 10/8/2012 | 10/9/2012 | 10/9/2012 9:48:43 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00078
| INSP-Final Inspection | 10/8/2012 | 10/9/2012 | 10/9/2012 9:48:15 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00307
| FIR-Aging Inspection | 10/9/2012 | 10/9/2012 | 10/9/2012 8:18:38 AM | | NR |
|
|
Steve is scheduling these DSC inspections.
|
FIR12-00306
| FIR-Aging Inspection | 10/9/2012 | 10/9/2012 | 10/9/2012 8:18:08 AM | | NR |
|
|
Steve is scheduling these DSC inspections.
|