PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, October 9, 2012
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Kimberly M. Johnson
Title
EROSION CONTROL
Phone #
208-794-3958
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC12-00508
General Inspection
10/9/2012
10/9/2012
10/10/2012 2:04:43 PM
PART
extended disturbance passed wattles providing perimeter control along Highland Dr. Met with RP on site and he want to stabilize the disturbed area with gravel. Recommended he contact ACHD for concurrence since this is in ACHD ROW
ESC12-01003
General Inspection
10/9/2012
10/9/2012
10/10/2012 12:59:53 PM
NR
ESC11-00785
Aging Inspection
10/9/2012
10/9/2012
10/10/2012 10:08:05 AM
CANC
permit finaled
ESC11-00888
Aging Inspection
10/9/2012
10/9/2012
10/10/2012 9:56:00 AM
CANC
finaled
ESC11-00754
Aging Inspection
10/9/2012
10/9/2012
10/9/2012 2:27:47 PM
CANC
permit finaled.
ESC12-00036
General Inspection
10/9/2012
10/9/2012
10/9/2012 1:19:50 PM
FAIL
Interior slopes of park have been seeded and mulched. Landscaping on north parking parking lot complete. Staging area on south side (off of McMillian) not stabilized. Perimeter controls are in place
ESC12-00668
General Inspection
10/9/2012
10/9/2012
10/9/2012 11:12:32 AM
PASS
ESC12-00660
General Inspection
10/9/2012
10/9/2012
10/9/2012 11:03:24 AM
PASS
ESC11-00755
Aging Inspection
10/9/2012
10/9/2012
10/9/2012 10:37:44 AM
PASS
Final stabilization complete. Trash needs hauled off before permit can be finaled
ESC11-00754
DOC - Permit Finaled
10/9/2012
10/9/2012
10/9/2012 10:36:55 AM
P
PASS
ESC12-00795
BMP Violation
10/9/2012
10/9/2012
10/9/2012 10:22:38 AM
P
PART
Construction ramp built over sidewalk and gutter with dirt. Clean up in progress at time of re-inspection
ESC12-00526
General Inspection
10/9/2012
10/9/2012
10/9/2012 12:00:00 AM
PASS
ESC12-00929
Random Inspection
10/9/2012
10/9/2012
10/9/2012 12:00:00 AM
P
PART
BMPs not sufficient in narrow areas. Blade for grading too wide and soil was being pushed on top of and some instances over the the wattle. Contractor had already called out RP group to widen perimeter controls to edge of disturbance (barb wire fence line) and to install sandbags along narrow areas where height of wattle is not sufficient.