Inspections for the day of: Wednesday, October 9, 2013.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00170 INSP-Alarm Testing10/9/201310/9/201310/9/2013 3:36:57 PMPPASS
Completed remainder of alarm testing at the gatehouse including previous corrections and adjustment items. Override switch at the panel MP has been removed.
FIR13-00436 INSP-Sprinkler Rough-in10/9/201310/9/201310/9/2013 3:29:21 PMPPART
Remainder of the overhead work at the pharmacy and west lower ceiling retail areas passed rough-in and are approved for cover. Verified balance of branchline restraints are installed in the high bays, drops at cloud ceilings okayed. Need to provide coverage at the SW exit vestibule, remove travel caps at drops, install escutcheons and field ceiling tile prior to permit final.
BLD13-01271 FIRE-Final Inspection10/7/201310/9/201310/9/2013 3:24:18 PMAPASS
Fire life safety inspection and walkthrough for the scope of work passed.
FIR13-00538 INSP-Final Inspection10/8/201310/9/201310/9/2013 3:21:20 PMAPASS
Fire alarm work passed site inspection and functional test. Permit finaled.
FIR13-00489 INSP-Sprinkler Rough-in10/8/201310/9/201310/9/2013 3:20:12 PMAPART
Okay to cover overhead work at the grid ceilings.