ESC13-00537
| General Inspection | 10/9/2013 | 10/9/2013 | 10/10/2013 11:23:41 AM | | PASS |
|
|
Had confence with RSCI project manager Cory Kessler (###-####) regarding site setup. Permit and plan are at job trailor. Construction will begin next week. Site is contained by new access (to be paved after completion of project) and will have silt fence along south and east to prevent runoff down to biosolids treatement pasture. Re-inspection of BMPs will occur next Wednesday. Approved.
|
ESC12-00845
| General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 2:48:42 PM | | PASS |
|
|
Canal has been placed in culvert and is covered now. Construction on-going. No ESC violations at this time but will need to keep back entrance to lot clean. Landscaping is occuring in the front a long Warm Springs.
|
ESC13-00546
| General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 2:22:33 PM | | NH |
|
|
No activity. Unclear if work on the tower support room is complete. No ESC violations at this time.
|
ESC13-00542
| General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 1:28:05 PM | | PASS |
|
|
WIP. No ESC violations at this time. MS4 protection provided. Minimal track out; permit posted.
|
ESC13-00547
| General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 1:12:42 PM | | PASS |
|
|
Work on large concrete retiaining wall behind business is ongoing. Cement truck on-site using kiddie pool for washout. Permit is posted at south access point with BMPs to conatain slurry. No track out or other ESC violations. Approved.
|
ESC13-00912
| Site Preparation | 10/9/2013 | 10/9/2013 | 10/9/2013 11:22:54 AM | P | FAIL |
|
|
Correction Notice - post permit, install BMPs. Called RP Rob Haddock ###-#### to request corrections. Scheduled BMP inspection for tomorrow afternoon. If no corrections, will stop work.
|
ESC12-00885
| Aging Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 10:46:48 AM | | PASS |
|
|
Finaled.
|
ESC12-00885
| DOC - Permit Finaled | 10/9/2013 | 10/9/2013 | 10/9/2013 10:46:18 AM | P | PASS |
|
|
House is built, landscaped and stabilized. BLD permit has been finaled. No ESC violations, no further ESC inspections required.
|
ESC13-00262
| Aging Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 10:12:14 AM | | PASS |
|
|
Finaled. See notes for details.
|
ESC13-00262
| DOC - Permit Finaled | 10/9/2013 | 10/9/2013 | 10/9/2013 10:11:43 AM | P | PASS |
|
|
House is complete with landscaping and stabilization of distubred areas. Construction materials and BMPs removed. All other permits finaled. No further ESC inspections necessary.
|
ESC13-00303
| Aging Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 9:40:59 AM | | PASS |
|
|
Finaled. See notes.
|
ESC13-00303
| DOC - Permit Finaled | 10/9/2013 | 10/9/2013 | 10/9/2013 9:40:41 AM | P | PASS |
|
|
Demo of canopy complete, property line readjusted. No further activity. No ESC violations or materials left on site. BLD permit has been finaled, no further ESC inspections required.
|
ESC13-00561
| Random Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 9:26:40 AM | P | PASS |
|
|
Permit posted. BMPs in place include inlet protection for parking lot storm drains, perimeter wattles around areas of activity, and a dust screen fence. Nice site. Approved - was called out for phase II inspection, which has not yet begun; this permit covers phase I.
|
ESC13-00597
| General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 9:23:45 AM | | NR |
|
|
This permit is for phase II of work at Treasure Valley Hospital. The project is still in phase I and coverered with ESC13-00561.
|
ESC13-00511
| General Inspection | 10/9/2013 | 10/9/2013 | 10/9/2013 9:05:42 AM | | PASS |
|
|
Perimeter wattles installed. Parking lot area surrounding drive thru work is well swept. No activity during inspection, but project is not complete.
|