Inspections for the day of: Thursday, October 9, 2014.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-00013 ELE-Aging Inspection10/9/201410/9/201410/10/2014 1:44:51 PM DONE
Refer to ele13-00572 for contractor info on service change
ELE13-00013 Final10/9/201410/9/201410/9/2014 3:59:24 PMPPASS
refer to ele13-00572 for contractor info on job. Final ok
ELE14-01483 Final10/9/201410/9/201410/9/2014 3:48:30 PMPPASS
Kenny Phone #: ###-#### Final ok
GCE14-00167 GCE-Rough-In10/9/201410/9/201410/9/2014 3:17:38 PMPPASS
Steve ###-#### rough-in and cover Back south addition rough in ok cover.
GCE14-00172 GCE-Rough-In10/9/201410/9/201410/9/2014 3:00:08 PMPPASS
Karl ###-#### Small single underground conduit for pizzaria rough in ok cover.
ELE14-02799 Temporary Service10/9/201410/9/201410/9/2014 2:20:28 PMPPASS
Phone #: ###-#### Inspection requested via web by daniel bibikov t/s u/g n ok
ELE14-02207 Final10/9/201410/9/201410/9/2014 2:17:45 PMPPASS
Phone #: ###-#### Inspection requested via web by daniel bibikov Final ok
ELE14-01987 Final10/9/201410/9/201410/9/2014 1:09:59 PMPFAIL
Phone #: ###-#### Inspection requested via web by daniel bibikov 210.51 (D) Bathrooms. In dwelling units, at least one receptacle
outlet shall be installed in bathrooms within 900 mm (3 ft) of the outside edge of each basin. The receptacle outlet shall be located on a wall or partition that is adjacent to the basin or basin countertop, located on the countertop, or
installed on the side or face of the basin cabinet.
400.8 Uses Not Permitted. Unless specifically permitted
in 400.7, flexible cords and cables shall not be used for the
following:
(1) As a substitute for the fixed wiring of a structure
(2) Where run through holes in walls, structural ceilings,
suspended ceilings, dropped ceilings, or floors
(3) Where run through doorways, windows, or similar
openings
(4) Where attached to building surfaces.

314.25 Covers and Canopies. In completed installations, each box shall have a cover.
ELE14-02138 Final10/9/201410/9/201410/9/2014 12:33:43 PMPPASS
Phone #: ###-#### Inspection requested via web by daniel bibikov Final ok
ELE14-01863 Final10/8/201410/9/201410/9/2014 10:10:59 AMAPASS
Home owners live in house remodel final for back master bedroom. Phone #: ###-#### Inspection requested via web by Zane Robertson Final ok
ELE14-02789 Permanent Service10/8/201410/9/201410/9/2014 9:38:15 AMAPASS
Bill Peace is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce p/s o/h rec ok
ELE14-02676 Electrical Rough-In10/8/201410/9/201410/9/2014 8:53:23 AMAPASS
Ufer Ground. Toby is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen # 2 bare concrete encased grounding electrode rough in ok cover
ELE14-02675 Electrical Rough-In10/8/201410/9/201410/9/2014 8:52:30 AMAPASS
Underground cover. Toby is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen Low volt conduits on south side of office bldg rough in ok cover
ELE14-02335 Final10/8/201410/9/201410/9/2014 8:29:19 AMAPASS
parking lot lights Phone #: ###-#### Inspection requested via web by Chris Berthelot Final ok
ELE14-02676 Final10/8/201410/9/201410/8/2014 3:05:17 PMACANC
Ufer ground. Toby is the onsite contact. Phone #: ###-#### >> Inspection requested via web by Buster Bowen Inspection cancelled from web by: Buster Bowen