FIR14-00534
| INSP-Sprinkler Rough-in | 10/9/2014 | 10/9/2014 | 10/9/2014 3:36:59 PM | P | PASS |
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has been passed
|
FIR14-00552
| INSP-Supply line flush | 10/9/2014 | 10/9/2014 | 10/9/2014 3:15:51 PM | P | PASS |
|
|
UG flush passed
|
BLD13-02019
| FIRE-Final Inspection | 10/7/2014 | 10/9/2014 | 10/9/2014 2:03:06 PM | A | CANC |
|
|
cancel per John Phone #: ###-####
|
FIR14-00464
| INSP-Sprinkler Rough-in/Hydro | 10/8/2014 | 10/9/2014 | 10/9/2014 12:52:33 PM | A | PART |
|
|
Overhead hydro tests passed. Piping, as installed/rough-in passed. But routeing and fitting counts have changed and per the review notes any modifications will require resubmittals. So prior to an approval for cover being given I need plan modifications and a tenting inspection.
|
FIR14-00461
| INSP-Final Inspection | 10/9/2014 | 10/9/2014 | 10/9/2014 12:50:24 PM | P | PASS |
|
|
Permit finaled
|
FIR14-00581
| INSP-Sprinkler Rough-in | 10/8/2014 | 10/9/2014 | 10/9/2014 12:50:05 PM | A | PART |
|
|
Todays inspection was for a rough-in for the second and third floors. Rough-in passed. Two locations are marked where heads have not been installed yet. Third floor piping is ok to cover. First, second and the stairwells can not be covered until insulation/filling has been verified.
|
BLD14-01507
| FIRE-Final Inspection | 10/8/2014 | 10/9/2014 | 10/9/2014 11:35:38 AM | A | PASS |
|
|
life safety passed
|
BLD14-02913
| FIRE-Final Inspection | 10/8/2014 | 10/9/2014 | 10/9/2014 11:33:07 AM | A | FAIL |
|
|
Provide revised floor plan to plan review, provide sticker at the main exit, remove the deadbolts/thumbturn from the exit doors and provide single action hardware. The main exit is ok to be keyed.
|
BLD14-02366
| FIRE-Final Inspection | 10/8/2014 | 10/9/2014 | 10/8/2014 3:30:58 PM | A | PART |
|
|
A temporary occupancy is approved with Scott's permission until the door hardware issue is worked out between the plan reviewer and the architect.
|