Inspections for the day of: Monday, October 9, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF17-00012 INSP-Final10/9/201710/9/201710/9/2017 1:58:22 PMPFAIL
Need a fire alarm permit to address the relocated fire alarm manual pull station. It was relocated and installed at the incorrect height.
BLD16-03883 FIRE-Final Inspection10/6/201710/9/201710/9/2017 12:28:31 PMPFAIL
Left message on voice mail that I would be there in 20 or 30 minutes. Arrive at job site but had no contact or access. I left another voice message to re-schedule.

Ken-please call 30 minutes prior to meet for access Phone #: ###-####
BLD16-03749 FIRE-Final Inspection10/9/201710/9/201710/9/2017 12:12:48 PMPFAIL
Need city approved plans/documents, need address numbers as discussed.
FIR17-00583 INSP-Final Inspection10/9/201710/9/201710/9/2017 10:37:07 AMPPASS
permit finaled
FIR17-00583 INSP-Sprinkler Rough-in10/6/201710/9/201710/9/2017 9:39:14 AMAPASS
Rough-in passed. Piping can be covered.
FIR17-00582 INSP-Final Inspection10/6/201710/9/201710/9/2017 8:41:52 AMAFAIL
Left voice message on contacts voice mail at 7am. Went to project site and waited till nearly 8am but not contact made. I did speak to the project super intendant about fire alarm and life safety requirements.

wants before 8am (told him to call Troy to arrange time) // Stan Phone #: ###-####
BLD17-02636 FIRE-Final Inspection10/9/201710/9/201710/9/2017 8:39:15 AMPPASS
life safety passed
FIR17-00352 INSP-Sprinkler Rough-in10/6/201710/9/201710/9/2017 8:23:20 AMAPASS
Underground supply line inspection passed. Piping can be covered.
FIR17-00320 INSP-Sprinkler Rough-in10/6/201710/9/201710/9/2017 8:23:04 AMAPASS
Underground supply line inspection passed. Piping can be covered.