BLD18-02561
| BLD-Ceiling Grid Inspection | 10/8/2018 | 10/9/2018 | 10/9/2018 3:40:20 PM | P | PASS |
|
|
Tyler Phone #: ###-####
|
BLD18-01252
| BLD-Final | 10/9/2018 | 10/9/2018 | 10/9/2018 3:39:58 PM | P | PASS |
|
|
Plans have been left on site in the meter box. Phone #: ###-#### Inspection requested via web by Ashley White pending ele permit sign off.
|
BLD18-01252
| DOC - Permit Finaled | 10/9/2018 | 10/9/2018 | 10/9/2018 3:39:25 PM | P | PASS |
|
|
|
BLD18-02804
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 3:38:07 PM | A | PASS |
|
|
Tyler Phone #: ###-####
|
BLD18-03341
| BLD-Foundation | 10/9/2018 | 10/9/2018 | 10/9/2018 2:37:41 PM | A | PASS |
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD18-03044
| BLD-Footing | 10/9/2018 | 10/9/2018 | 10/9/2018 1:38:50 PM | P | NR |
|
|
Derik Phone #: ###-####
|
BLD18-03689
| DOC - Permit Finaled | 10/9/2018 | 10/9/2018 | 10/9/2018 1:11:45 PM | P | PASS |
|
|
|
BLD18-03700
| BLD-Conference | 10/9/2018 | 10/9/2018 | 10/9/2018 10:54:02 AM | A | FAIL |
|
|
justify 2 layers of roof decking and 2 layers of rooffing for dead loading per code.
|
BLD17-04483
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 10:37:27 AM | A | FAIL |
|
|
Franciso Phone #: ###-#### need ada backing
|