MEC18-03805
| Pressure Test | 10/9/2018 | 10/9/2018 | 10/9/2018 3:51:11 PM | P | DONE |
|
|
gas company would not set meter said there wasn't a sticker- sticker was onsite
|
MEC18-04809
| Final | 10/9/2018 | 10/9/2018 | 10/9/2018 3:22:38 PM | P | PASS |
|
|
Please call tenant prior to arrival for inspection. ###-#### Phone #: ###-#### Inspection requested via web by kelly Martin - furnace only and co ok
|
MEC18-04842
| Pressure Test | 10/9/2018 | 10/9/2018 | 10/9/2018 2:44:55 PM | P | PASS |
|
|
Gas Line Pressure Test- Please call Aaron the installer when in route to home ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd- 20lb gas pressure test ok- tagged meter bar
|
MEC18-04855
| Final | 10/9/2018 | 10/9/2018 | 10/9/2018 1:58:35 PM | P | PASS |
|
|
Would like PM and call on way at ###-####3. Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- electric furnace ac coil ok
|
MEC17-03454
| Mec-Aging Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 1:04:20 PM | | FAIL |
|
|
no inspection scheduled
|
MEC17-02128
| Mec-Aging Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 1:03:49 PM | | FAIL |
|
|
no inspection scheduled
|
MEC18-04158
| Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 11:06:13 AM | A | PASS |
|
|
Rough in for cover. Aaron Roberts is the site contact: ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - R/I ok- ceiling cover ok
|
MEC18-04516
| Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 11:05:27 AM | A | PART |
|
|
Rough in for cover. Aaron Roberts is the site contact: ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - partial R/I for bathrooms ok for cover in bathrooms
|
MEC18-04709
| Final | 10/5/2018 | 10/9/2018 | 10/9/2018 9:57:31 AM | A | PASS |
|
|
If possible, please call home owner one hour before at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by James Cox- furnace only co ok
|
MEC18-03033
| Final | 10/8/2018 | 10/9/2018 | 10/9/2018 9:33:36 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- need duct blast and air balance report
|
MEC18-01415
| Final | 10/8/2018 | 10/9/2018 | 10/9/2018 9:10:15 AM | A | PART |
|
|
RICK ###-#### 3 FIREPLACES - NO GAS TO UNITS AT TRIM ENTRY KEY BY MAIN DOOR IN BLACK BOX WHERE A/C LINES COME OUT FROM UNDER HOUSE (APPROX 10 FT LEFT OF MAIN GARAGE DOOR) Phone #: ###-#### Inspection requested via web by Mike Almanza -partial final waiting on gas line tie in on fireplaces- need to make sure installation instructions are onsite for all fireplaces
|
MEC18-02618
| Rough-in | 10/3/2018 | 10/9/2018 | 10/9/2018 8:37:46 AM | A | PASS |
|
|
Please call the customer when on way: Larren Novak ###-#### We had a partial pass on the last Rough-In because we needed a Blast and Flue Test. The Blast has been done, the Flue Test will be ready when we FINAL the job. Phone #: ###-#### Inspection requested via web by Krista Boss- duct blast ok- still need to prove 1/2" gas line is big enough for the furnace- flue test will be done at final- will want to see dryer vent box sealed at final
|