ELE99-03856
| Electrical Rough-In | 10/28/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | A | PART |
|
|
###-#### PLEASE CALL FIRST Conference
|
ELE99-01258
| Final | 10/28/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | A | FAIL |
|
|
HOMEOWNER PAIGE---CALL 1ST BEFORE INSP --###-#### Kitchen GFCI recepticle not operating properly.
|
ELE99-03252
| Electrical Rough-In | 10/29/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | A | PART |
|
|
INSP THE SER CHANGE--HOMEOWNER-- DIANE -###-#### Conference; grounding of service panel.
|
ELE99-02772
| Final | 10/29/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 16:46:52. Contact: ###-####. Corrections completed
|
ELE99-01707
| Electrical Rough-In | 11/1/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 07:51:22. Contact: ###-####. Ceiling: ELE R/I; front office area; mens locker room.
|
ELE99-03610
| Electrical Rough-In | 11/1/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | P | PART |
|
|
DON ###-#### Ground-work, PVC
|
ELE99-03905
| Final | 11/1/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 09:15:17. Contact: ###-####. Relocated 3 switches.
|
ELE99-03704
| Electrical Rough-In | 11/1/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | P | PART |
|
|
brenda ###-#### r/I Walls; ceiling; ELE R/I
|
ELE99-03120
| Electrical Rough-In | 11/1/1999 | 11/1/1999 | 11/1/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 10:55:58. Contact: ###-####. Suites; East wing, 6th floor.
|