BLD01-01784
| BLD-Foundation | 10/31/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | A | CANC |
|
|
###-#### justin
|
BLD01-01697
| BLD-Framing/Rough-in | 10/31/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | A | PART |
|
|
###-#### JIM GRID CEILING . lights and bath fans req wires not done grid ok. 11/1/2001 5:16:52 PM
|
BLD00-02920
| BLD-Conference | 10/31/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 14:38:52. Contact: ###-####. 4hr wall penetration needs 1/4 strip past sheetrock. 11/2/2001 8:22:26 AM
|
BLD01-02555
| BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | A | PART |
|
|
###-#### ok now was pending plumbing. 11/1/2001 5:08:52 PM
|
BLD00-03538
| BLD-Energy code compliance | 10/31/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | A | CANC |
|
|
###-#### MIKE
|
BLD01-02591
| BLD-Footing | 10/31/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02186
| FIRE-Final Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | P | CANC |
|
|
AARON ###-####
|
BLD01-01032
| BLD-Final | 11/1/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | P | NR |
|
|
###-####. needs all other signatures. 11/1/2001 4:12:14 PM
|
BLD01-02622
| BLD-Framing/Rough-in | 11/1/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | P | PART |
|
|
###-#### ERIC 5TH FLOOR. Needs electrical, and brace tops of walls and rfi from architect for wood studs /plans call for steel. Ok for type III-N. 11/1/2001 5:11:13 PM
|
BLD00-02920
| BLD-Final | 11/1/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | P | PART |
|
|
###-#### hugo. 4hr wall missing collar at west side . location basement. 11/2/2001 11:02:13 AM
|
BLD01-02555
| BLD-Final | 11/1/2001 | 11/1/2001 | 11/1/2001 12:00:00 AM | P | PASS |
|
|
fn -dave ###-#### ok perm oc. 11/1/2001 4:06:28 PM
|