ELE06-00422
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 4:21:05 PM | P | PART |
|
|
this is for a ceiling inspection, if you can't reach Steve Nuxoll please call Nate Peterson @ ###-####; Phone #: ###-#### Internet Inspection Request from: Jeff Radford ceiling ok
|
ELE06-03164
| Permanent Service | 11/1/2006 | 11/1/2006 | 11/1/2006 4:20:22 PM | P | PASS |
|
|
Bill; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt p/s u/g for meter ok
|
ELE06-04058
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 3:18:00 PM | P | PASS |
|
|
Please inspect after 1:00 pm, call homeowner ###-#### prior to inspecting. Work performed by Steve Johsnon.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz vacuum circuit r/i ok
|
ELE06-04058
| Final | 11/1/2006 | 11/1/2006 | 11/1/2006 3:15:23 PM | P | PASS |
|
|
Please inspect after 1:00 pm, call homeowner ###-#### prior to inspecting. Work performed by Steve Johsnon.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz ok
|
ELE06-03349
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 3:14:48 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Tracy Robertson r/i all 4 units ok
|
ELE06-03349
| Permanent Service | 11/1/2006 | 11/1/2006 | 11/1/2006 3:14:24 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Tracy Robertson p/s u/g new ok
|
ELE06-04054
| Rough-In Permanent Service | 11/1/2006 | 11/1/2006 | 11/1/2006 3:13:47 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Paul Schepper survey , 314.20 outside outlets boxes shall be flush, 300.4 nail plates, replace broken outside light box side exit garage, r/i ok p/s u/g new ok
|
ELE06-03986
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 1:18:02 PM | P | PART |
|
|
Trench Inspection; Phone #: ###-#### Internet Inspection Request from: Alan Lusk east end of site, north side trench to postat west end ok
|
ELE06-03984
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 1:16:15 PM | P | PART |
|
|
Final Ufer ground inspection; Phone #: ###-#### Internet Inspection Request from: Alan Lusk ok for dirt cover
|
ELE06-03983
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 1:15:49 PM | P | PART |
|
|
Final Ufer inspection; Phone #: ###-#### Internet Inspection Request from: Alan Lusk ok for dirt cover
|
ELE06-03978
| Electrical Rough-In | 11/1/2006 | 11/1/2006 | 11/1/2006 1:15:23 PM | P | PART |
|
|
Final UFER Ground and trench inspection; Phone #: ###-#### Internet Inspection Request from: Alan Lusk ok for dirt cover
|
ELE06-04037
| Electrical Rough-In | 10/31/2006 | 11/1/2006 | 11/1/2006 10:09:49 AM | A | FAIL |
|
|
Dennis (shell building E); Phone #: ###-#### Internet Inspection Request from: Rita DeYoung called for info and address location left message no address or street sign
|
ELE06-04046
| Electrical Rough-In | 10/31/2006 | 11/1/2006 | 11/1/2006 9:53:13 AM | A | PASS |
|
|
laura ; Phone #: ###-#### - note: call 1/2 prior to going out - Internet Inspection Request from: Patricia ok survey posted seal KOs and use bond bushings for RE washers panel
|
ELE06-04046
| Final | 11/1/2006 | 11/1/2006 | 11/1/2006 9:52:22 AM | A | PASS |
|
|
laura ; Phone #: ###-#### - note: call 1/2 prior to going out - Internet Inspection Request from: Patricia Smith ok card signed
|
ELE06-03773
| Final | 11/1/2006 | 11/1/2006 | 11/1/2006 9:17:03 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Clyde Logan ok card signed
|
ELE06-04040
| Electrical Rough-In | 10/31/2006 | 11/1/2006 | 11/1/2006 8:54:32 AM | A | FAIL |
|
|
corey - note: call for acess; Phone #: ###-#### Internet Inspection Request from: Patricia Smith corr. called 300.11(C) shall not support cables from other cables, 300.4 nail plates , remove MC and ENT from channel of steel studs, 330.30 (B) strap MC within 12" of boxes and fans
|
ELE06-04029
| Temporary Service | 10/31/2006 | 11/1/2006 | 11/1/2006 8:14:44 AM | A | FAIL |
|
|
wayne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles corr. called 300.10 bond bushings for R E washers, use plastic conn for GEC, 550.11(D) job trailer needs 60 amp and #6 copper per nameplate
|
ELE06-02856
| ELE-Aging Inspection | 11/1/2006 | 11/1/2006 | 11/1/2006 6:52:04 AM | | DONE |
|
|
|
ELE06-02856
| DOC - Permit Finaled | 11/1/2006 | 11/1/2006 | 11/1/2006 6:51:50 AM | A | PASS |
|
|
ok no electrical
|