Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00406 FIR-Aging Inspection11/1/200711/1/200711/1/2007 6:31:20 PM DEFR
Work in progress.
FIR07-00788 INSP-Final Inspection10/31/200711/1/200711/1/2007 6:08:39 PMAPART
OH install approved for cover at the drop ceilings, OH hydro completed and passed.
FIR07-00768 INSP-Conference10/31/200711/1/200711/1/2007 6:07:29 PMANR
Inspection rescheduled per contractor.
FIR07-00575 INSP-Sprinkler Rough-in/Hydro10/31/200711/1/200711/1/2007 6:06:43 PMAPART
24 hr. air test for the preaction system passed, overhead install is approved for cover at the drop ceilings with the exception of two noted locations which will need coverage adjustment-see approved plans for annotations.
BLD07-00292 FIRE-Final Inspection10/31/200711/1/200711/1/2007 10:25:17 AMAFAIL
Need to add EM lighting as discussed, missing the north exit door and hardware, need to provide max. occupant load signage, south exit discharge path is not completed at this time.