Inspections for the day of: Monday, November 1, 2010.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00198 General Inspection11/1/201011/1/201011/1/2010 2:49:44 PMPPART
Site equipment has been moved out of the soil screening area. Stockpiles remain the same no signs of material being moved out and site grading complete. Will follow up.
ESC06-01306 General Inspection11/1/201011/1/201011/1/2010 2:05:22 PMPPASS
Site looks good, sign posted, additional washed rock has been added, no issues observed.
ESC10-00531 Conference11/1/201011/1/201011/1/2010 12:00:00 AMADONE
Talked to RP (Mike Smith) via telephone, informed him that the silt fence installed at Solaire was not installed correctly and that this needs to be re-installed. As well, trash and construction debris needs better managment. RP said this will be taken care of this morning. Inspector 460 will inspect.