BLD11-01934
| BLD-Framing/Rough-in | 11/1/2011 | 11/1/2011 | 11/1/2011 4:21:13 PM | P | PASS |
|
|
junior - late afternoon please Phone #: ###-####. double layer 5/8 type x at canopy lid ok.
|
ESC11-00712
| Site Preparation | 11/1/2011 | 11/1/2011 | 11/1/2011 4:12:21 PM | P | PASS |
|
|
|
BLD11-02395
| BLD-Footing | 11/1/2011 | 11/1/2011 | 11/1/2011 4:11:58 PM | P | PASS |
|
|
BRENT Phone #: ###-####
|
ESC10-00670
| Random Inspection | 11/1/2011 | 11/1/2011 | 11/1/2011 2:35:14 PM | P | PASS |
|
|
|
BLD11-01333
| BLD-Conference | 10/31/2011 | 11/1/2011 | 11/1/2011 2:34:38 PM | P | PART |
|
|
Well house and dumpster enclosure footing and rebar inspection. Concrete at 1:30 PM Special inspector scheduled for 12:00 Noon Phone #: ###-#### >> Inspection requested via web by Scott Greer. Work in progress on installing vertical reinforcement. Special inspector was on site.
|
BLD11-01691
| BLD-Final | 11/1/2011 | 11/1/2011 | 11/1/2011 2:18:59 PM | P | DONE |
|
|
|
BLD11-01691
| DOC - Permit Finaled | 11/1/2011 | 11/1/2011 | 11/1/2011 2:18:49 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
MIS11-00279
| BLD-Conference | 11/1/2011 | 11/1/2011 | 11/1/2011 1:18:00 PM | P | FAIL |
|
|
RE-ROOF BEING DONE WITHOUT A PERMIT ADDING 3RD LAYER OF SHINGLE'S PLEASE CHECK THIS OUT. Needs a building permit for work being done. Also noted that 2layers of shingles are existing. Existing 2 layers must be removed prior to addeing new shingles per IRC SEC. 907.3 #3. Stop- work and double fee has been placed.
|
BLD11-02395
| BLD-Footing | 10/31/2011 | 11/1/2011 | 11/1/2011 11:14:00 AM | A | FAIL |
|
|
brent Phone #: ###-####. Wil need to provide engineering for #4 bar at 2ft. oc. This falls out of the prescriptive portion of IRC. Concrete contractor was notified.
|
BLD11-01691
| BLD-Final | 10/31/2011 | 11/1/2011 | 11/1/2011 11:08:43 AM | A | DEFR |
|
|
janet Phone #: ###-####
|
MIS11-00277
| BLD-Conference | 10/31/2011 | 11/1/2011 | 11/1/2011 10:34:45 AM | A | DONE |
|
|
Complaint of roofing without a permit.
|
MIS11-00277
| DOC - Permit Finaled | 11/1/2011 | 11/1/2011 | 11/1/2011 10:34:35 AM | P | PASS |
|
|
No work at this address.
|
BLD11-02550
| BLD-Framing/Rough-in | 10/25/2011 | 11/1/2011 | 11/1/2011 10:13:59 AM | A | PASS |
|
|
Larry Phone #: ###-####. Pending plumbing rough in inspection.
|
MIS11-00278
| BLD-Conference | 10/31/2011 | 11/1/2011 | 11/1/2011 9:54:41 AM | A | FAIL |
|
|
complaint -occupying space with out an occupancy ( hookah bar). Noted that space is being occupied by a hooka bar and appears to have been open for business with no certificate of occupancy. A correction notice has been issued noting to submit plans to plan review and zoning for all required approvals, get all required inspections to obtain certificate of occupancy.
|
BLD11-01934
| BLD-Wall cover | 11/1/2011 | 11/1/2011 | 11/1/2011 9:37:05 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Les Seal. Structural beam in canopy wrap with 5/8 type x rock, 2 layers ok.
|