ESC11-00733
| General Inspection | 11/1/2012 | 11/1/2012 | 11/1/2012 12:00:00 AM | | PASS |
|
|
|
ESC12-00403
| General Inspection | 11/1/2012 | 11/1/2012 | 11/1/2012 12:00:00 AM | | PART |
|
|
Infilitration Swale per approved dewatering plan in process of being constructed. Public works approved modified drainage plan 10/31. Side walls of basin need sloped 2:1. Contractor's stabilization preference for the walls is plastic. Plastic sheeting must be minimum 6 mil, keyed in at the top of slope and held in place with sandbags or other weights placed no more than 10 ft apart. Sema shall be taped or weighted down the entire length. Overlap shall be at least 24 inches. All edges should be embedded at least 6 inches into soil. Spoke to Noelle about these specifications via phone on 10/31
|