Inspections for the day of: Friday, November 1, 2013.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00215 INSP-Final Inspection10/29/201311/1/201311/6/2013 3:44:30 PMAPASS
Fire alarm permit finaled.
BLD13-01956 FIRE-Final Inspection11/1/201311/1/201311/5/2013 6:30:41 AMPPART
Pending corrections
BLD13-02815 FIRE-Final Inspection11/1/201311/1/201311/1/2013 6:22:29 PMPPART
BLD13-02817 FIRE-Final Inspection10/31/201311/1/201311/1/2013 6:21:40 PMPNR
Project not in condition for final at the time of inspection- missing ceiling tile, doors, one wall, etc. Finishes underway.
FIR13-00498 INSP-Final Inspection11/1/201311/1/201311/1/2013 6:19:57 PMPPASS
Fire alarm permit approved for final.
FIR13-00452 INSP-Final Inspection10/31/201311/1/201311/1/2013 6:19:08 PMPPART
Final pending points map, updated plan showing correct MP station location, sign at door to the FACP room, knox box, provide visual coverage at the hall to the beer cooler, one av at the waitstaff station is obstructed, provide signals report from todays inspection.
FIR13-00561 INSP-Final Inspection11/1/201311/1/201311/1/2013 6:08:23 PMPPART
Overhead rough-in okay to cover. Final pending field ceiling tile and finishes.
FIR13-00551 INSP-Final Inspection10/31/201311/1/201311/1/2013 6:07:00 PMPPASS
Hood suppression system operated correctly under test conditions. Permit finaled.
FIR13-00264 INSP-Final Inspection10/31/201311/1/201311/1/2013 6:05:30 PMAPART
Final pending relocation of the outside bell per plan and power supply to the air compressor.
FIR13-00325 INSP-Final Inspection11/1/201311/1/201311/1/2013 5:56:01 PMACANC
Overbooked
FIR13-00433 INSP-Final Inspection10/31/201311/1/201311/1/2013 11:49:29 AMAPASS
Fire sprinkler permit finaled.
FIR13-00436 INSP-Final Inspection10/31/201311/1/201311/1/2013 11:48:26 AMAPASS
Scope of work completed. Final walkthrough passed. Flow switch at the existing riser to be repaired prior to project related building permit final.
FIR13-00583 INSP-Final Inspection10/31/201311/1/201311/1/2013 11:45:17 AMAPASS
Fire alarm testing passed. Permit finaled.