BLD13-02663
| BLD-Final | 11/1/2013 | 11/1/2013 | 11/1/2013 4:39:51 PM | P | PASS |
|
|
scott Phone #: ###-####
|
BLD13-02663
| DOC - Permit Finaled | 11/1/2013 | 11/1/2013 | 11/1/2013 4:39:42 PM | P | PASS |
|
|
|
BLD13-00960
| BLD-Conference | 10/31/2013 | 11/1/2013 | 11/1/2013 3:43:16 PM | P | PASS |
|
|
Paula or Brendan Walker Phone #: ###-####. South exterior wall was moved to accomadate the minimum 10ft. set back. All work on interior is interior finishes, no plumbing or mech. work was done. Will pull electrical permit.
|
BLD13-00960
| BLD-Framing/Rough-in | 11/1/2013 | 11/1/2013 | 11/1/2013 3:39:26 PM | P | PASS |
|
|
Paula or Brendan Walker Phone #: ###-####
|
MIS13-00302
| BLD-Conference | 11/1/2013 | 11/1/2013 | 11/1/2013 2:41:21 PM | P | DONE |
|
|
Report business "Miracle Method" doing remodeling, removing/constructing walls without permits. couldn't find cert of occ either. After inspecting the premises, noted no evidence of construction going on.
|
BLD13-03046
| BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 2:35:24 PM | P | FAIL |
|
|
JImmy Phone #: ###-####. Provide the reqiored signage above main enterance/exit door. Remove thumb turns from both entry/exit doors and provide code compliant hardware. Correction notice posted.
|
BLD12-00382
| BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 1:38:24 PM | P | PART |
|
|
mike Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. electrical signs perm.
|
ESC12-00163
| Site Final | 11/1/2013 | 11/1/2013 | 11/1/2013 1:37:28 PM | P | DONE |
|
|
|
ESC12-00163
| DOC - Permit Finaled | 11/1/2013 | 11/1/2013 | 11/1/2013 1:37:18 PM | P | PASS |
|
|
|
BLD12-01487
| BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 1:36:56 PM | P | PASS |
|
|
mike Phone #: ###-####. Ok for perm occ.
|
BLD13-03027
| BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 10:21:12 AM | A | PASS |
|
|
Frank Phone #: ###-####. Ok for perm. occ.
|
ESC13-00654
| General Inspection | 11/1/2013 | 11/1/2013 | 11/1/2013 10:15:16 AM | A | PASS |
|
|
|
BLD13-01808
| BLD-Framing/Rough-in | 10/28/2013 | 11/1/2013 | 11/1/2013 10:10:40 AM | A | PART |
|
|
Paul Phone #: ###-####. Pending mechanical rough in inspection. Also needs to fire block HVAC ducts at ceiling, 2nd. floor.
|
BLD13-03028
| BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 9:32:50 AM | A | FAIL |
|
|
Early please - Tyler Phone #: ###-####. A building permit is required for the new demissing at west end of space that was constructed. Also per troy cobbley, the sprinkler heads are overspaced, will require a permit for repair. A correction noitce was issued.
|
BLD13-01539
| BLD-Other | 10/31/2013 | 11/1/2013 | | P | |
|
|
rebar on a slab // charles Phone #: ###-####
|
BLD13-01688
| BLD-Framing/Rough-in | 11/1/2013 | 11/1/2013 | | P | |
|
|
Charles Phone #: ###-####
|