MEC16-04830
| Final | 10/31/2016 | 11/1/2016 | 11/2/2016 2:29:22 PM | P | PASS |
|
|
Please call prior to inspection. Paul ; Esther Broyles ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC16-04848
| Final | 10/31/2016 | 11/1/2016 | 11/1/2016 4:26:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone
|
MEC16-04848
| Pressure Test | 10/31/2016 | 11/1/2016 | 11/1/2016 4:26:34 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- 5lb flue pass
|
MEC16-03915
| Final | 11/1/2016 | 11/1/2016 | 11/1/2016 3:27:04 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek- need drip leg on gas line at furnace- need combustion air to furnace room
|
MEC16-03914
| Final | 11/1/2016 | 11/1/2016 | 11/1/2016 3:26:40 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek- need drip leg on gas at furnace- need combustion air to furnace room
|
MEC16-04309
| Rough-in | 11/1/2016 | 11/1/2016 | 11/1/2016 2:09:04 PM | P | PART |
|
|
Brian-rough in inspection Phone #: ###-#### Inspection requested via web by Crystal Grant- grid line A-C and 8-11 sales area north east corner ok to insulate duct- seal ok-
|
MEC16-03918
| Final | 10/31/2016 | 11/1/2016 | 11/1/2016 1:36:28 PM | P | PART |
|
|
Request for a final inspection on Monday 31st if possible A.M. This inspection will be for South Retail Pad. Phone #: ###-#### We were able to fix the concern (- exhaust need to terminate 10'' away or 3'' above fresh air intakes ) Thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin- support duct on roof from moving- height above economizer is good
|
MEC16-03643
| Final | 10/31/2016 | 11/1/2016 | 11/1/2016 11:02:02 AM | A | PASS |
|
|
This is a retro Please call Michael @ ###-#### for access Thank you Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC16-04833
| Final | 10/31/2016 | 11/1/2016 | 11/1/2016 10:04:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC16-01404
| Mec-Aging Inspection | 11/1/2016 | 11/1/2016 | 11/1/2016 9:53:21 AM | | PASS |
|
|
|
MEC16-01404
| Final | 11/1/2016 | 11/1/2016 | 11/1/2016 9:53:10 AM | P | PASS |
|
|
|
MEC16-04393
| Rough-in | 10/31/2016 | 11/1/2016 | 11/1/2016 9:11:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- second layer fire wrap ok (2) ducts- ok to install ceiling
|