ELE16-03445
| Final | 11/1/2016 | 11/1/2016 | 11/1/2016 12:58:23 PM | P | CANC |
|
|
Scott Phone #: ###-#### needed p/s
|
ELE16-03445
| Permanent Service | 11/1/2016 | 11/1/2016 | 11/1/2016 12:58:13 PM | P | PASS |
|
|
Scott Phone #: ###-#### p/s o/h rec ok
|
ELE16-03443
| Electrical Rough-In | 11/1/2016 | 11/1/2016 | 11/1/2016 12:35:56 PM | P | PASS |
|
|
Solar Phone #: ###-#### Inspection requested via web by Thaniel Bishop Verified U/L listing and scope of work, Contractor will replace detached building service with a disconnecting means for ungrounded conductors
|
ELE16-03537
| Rough-In Permanent Service | 10/31/2016 | 11/1/2016 | 11/1/2016 10:39:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon Main level and upstairs(basement bath looked like only thing done downstairs)room with panel off garage ok cover p/s o/h n ok
|
ELE16-03538
| Temporary Service | 10/31/2016 | 11/1/2016 | 11/1/2016 8:38:46 AM | A | PASS |
|
|
Dave Phone #: ###-#### t/s o/h n ok
|
ELE16-03538
| Conference | 10/31/2016 | 11/1/2016 | 11/1/2016 8:38:24 AM | A | CANC |
|
|
Dave-you have already been out to talk to sherry Phone #: ###-#### No conferece needed at this time, only t/s will do conference once house is built and pulled another permit for house
|
ELE16-03534
| Temporary Service | 10/31/2016 | 11/1/2016 | 11/1/2016 8:22:59 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|