BLD17-02704
| FIRE-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 2:17:21 PM | P | CANC |
|
|
Mark Phone #: ###-####
|
BLD18-03905
| FIRE-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 11:52:44 AM | P | PASS |
|
|
Life safety passed. Smoke evac tested.
Jonny Phone #: ###-####
|
FIR18-00298
| INSP-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 11:52:16 AM | P | CANC |
|
|
Can't perform final until a rough-in inspection has been performed. As per previous inspection note the ceiling tile needs to be removed so that the piping can be inspected.
Contact Scotty Powada ###-#### 30 min prior to Fire Final Insp Start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00284
| INSP-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 11:51:10 AM | P | PASS |
|
|
Permit finaled
Contact Scotty Powada ###-#### 30 min prior to Fire final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD17-03833
| FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 11:16:50 AM | A | FAIL |
|
|
Not ready for final yet. The project related fire alarm and fire sprinkler permits need addressed and the non-combustible insulation filling the raised platform needs to be completed and inspected.
Clive Phone #: ###-####
|
BLD18-01332
| FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 11:03:24 AM | A | PASS |
|
|
Life safety passed. No brewing equipment present or installed in the future Brewery.
Steve Phone #: ###-####
|
BLD18-02579
| FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 10:27:09 AM | P | PASS |
|
|
Life safety passed. Per Jeff at TVFP the head infront of the unit heat will be changed to a high temp. today.
Please call 45 minutes before arrival. Thank you. Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero
|
FIR18-00570
| INSP-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 9:36:05 AM | P | FAIL |
|
|
The duct smoke detectors keep giving a invalid responce signal and a calibration signal and the remote LED's do not latch upon alarm.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
FIR18-00590
| INSP-Sprinkler Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 9:34:58 AM | A | PASS |
|
|
See the city approved plans for locations where piping above the hardlids is ok. I noted one earthquake brace needs to be re-positioned
Contact Andrew Larson - ###-#### 30 min prior to RTC Insp Start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00710
| INSP-Sprinkler Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 8:25:46 AM | A | PASS |
|
|
Rough-in passed for the two restrooms. Piping can be covered
,
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00672
| INSP-Sprinkler Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 8:19:27 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Stan Beus
|