MIS18-00414
| BLD-Conference | 10/24/2018 | 10/25/2018 | | A | |
|
|
per Dan E-working w/o permits
|
BLD18-00659
| BLD-Wall Bracing | 11/1/2018 | 11/1/2018 | 11/1/2018 4:30:08 PM | P | FAIL |
|
|
Mike Phone #: ###-####. Provide egress window in bonus room and provide min. 36 inch guard next to stairs.
|
BLD18-02579
| BLD-Final | 11/1/2018 | 11/1/2018 | 11/1/2018 3:33:45 PM | P | PART |
|
|
please call 45 minutes before arrival. Thank you, Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero. Ok for temp. occ. Needs to provide 1 hr door assembly at future paint booth.
|
BLD18-02579
| BLD-Final | 10/31/2018 | 11/1/2018 | 11/1/2018 3:32:57 PM | A | CANC |
|
|
please call 45 minutes before arrival. Thank you, Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero
|
BLD18-03905
| BLD-Final | 11/1/2018 | 11/1/2018 | 11/1/2018 3:11:32 PM | P | PART |
|
|
Jonny Phone #: ###-####. All issues resolved. Ok for temp occ. Will occupy space for less than 180 days. ( I signed wrong side of card, sorry)
|
BLD18-00796
| BLD-Final | 11/1/2018 | 11/1/2018 | 11/1/2018 2:44:52 PM | P | FAIL |
|
|
On-site contact is Pat Churchman Phone #: ###-#### Inspection requested via web by KJ Savaria. Need special inspection final letter and provide special inspection on the high strength bolting if not completed.
|
BLD18-02660
| BLD-Final | 11/1/2018 | 11/1/2018 | 11/1/2018 2:15:01 PM | P | PASS |
|
|
Scott Phone #: ###-####. Ok for perm occ. No card on site to sign.
|
BLD18-02660
| FIRE-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 2:14:38 PM | P | PASS |
|
|
Scott Phone #: ###-####. All issues resolved. Ok for perm occ. No card on site to sign.
|
BLD18-01499
| BLD-Framing/Rough-in | 11/1/2018 | 11/1/2018 | 11/1/2018 1:43:37 PM | P | FAIL |
|
|
Phone #: ###-####. Complete airseal pack. Provide non shrink grout under base plates.
|
BLD18-02795
| BLD-Foundation | 11/1/2018 | 11/1/2018 | 11/1/2018 1:22:37 PM | P | PASS |
|
|
rebar // Chad Phone #: ###-####. Interior and exterior column pad footings.
|
BLD18-01425
| BLD-Framing/Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 12:24:29 PM | A | DEFR |
|
|
steel -James Phone #: ###-####. Will have special inspection.
|
BLD18-00776
| BLD-Footing | 10/31/2018 | 11/1/2018 | 11/1/2018 10:31:12 AM | A | DEFR |
|
|
Charley Phone #: ###-####
|
BLD18-01390
| BLD-Wall Bracing | 10/31/2018 | 11/1/2018 | 11/1/2018 10:30:52 AM | A | PART |
|
|
Shear // Dave Phone #: ###-####. roof nailing and hardware ok to cover. Needs to install missing hold downs and provide the additional rows of nailing at holdown locations as per endwall details. Enginner of record to provide alternate nailing detail for stud nailing at corners.
|
BLD18-00404
| BLD-Foundation | 10/31/2018 | 11/1/2018 | 11/1/2018 9:21:52 AM | A | FAIL |
|
|
Steve Phone #: ###-####. Needs to upload a plan modification showing new building size and locations. Also noted that a different contractor has placed mono pole footing, no permit or inspections can be found at this time.
|
BLD18-02356
| BLD-Final | 10/31/2018 | 11/1/2018 | 11/1/2018 8:51:30 AM | A | FAIL |
|
|
request after 10 am // Said Phone #: ###-####. Provide ADA compliant door hardware to restroom. Provided smoke and flame spread data for interior finish on walls in facial room. Correction notice posted.
|