BLD17-03711
| BLD-Final | 10/29/2018 | 11/1/2018 | 11/1/2018 5:56:37 PM | A | NR |
|
|
Need ELE final
|
BLD18-00493
| BLD-Framing/Rough-in | 11/1/2018 | 11/1/2018 | 11/1/2018 5:56:10 PM | P | PASS |
|
|
OK to insulate
|
BLD18-00492
| BLD-Framing/Rough-in | 11/1/2018 | 11/1/2018 | 11/1/2018 5:55:51 PM | P | PASS |
|
|
OK to insulate
|
BLD18-00644
| BLD-Wall Bracing | 11/1/2018 | 11/1/2018 | 11/1/2018 5:53:25 PM | P | PASS |
|
|
Work in progress
|
BLD18-02501
| BLD-Other | 11/1/2018 | 11/1/2018 | 11/1/2018 5:53:03 PM | P | PASS |
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD18-02185
| BLD-Foundation | 10/31/2018 | 11/1/2018 | 11/1/2018 11:45:54 AM | A | PART |
|
|
Back retaining wall
|
BLD18-02260
| BLD-Foundation | 10/31/2018 | 11/1/2018 | 11/1/2018 11:45:21 AM | A | PASS |
|
|
Retaining wall
|
BLD18-02540
| BLD-Framing/Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 11:44:47 AM | A | PEND |
|
|
Framing good to go... Foam/air seal to be done before spray foam installation, call air seal...
|
BLD18-01167
| BLD-Other | 10/31/2018 | 11/1/2018 | 10/31/2018 5:24:32 PM | A | PASS |
|
|
Soffit. Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD17-03711
| BLD-Blower Door Test Results | 10/29/2018 | 11/1/2018 | 10/31/2018 10:05:19 AM | A | DONE |
|
|
ACH50- 3.7
|