ELE19-02495
| Final | 11/1/2019 | 11/1/2019 | 11/1/2019 2:56:36 PM | P | PASS |
|
|
I should be on-site by 2 pm. Access is available throughout the day Phone #: ###-#### Inspection requested via web by Sean Patton Final ok-no Occ card to sign
|
ELE19-03092
| Electrical Rough-In | 11/1/2019 | 11/1/2019 | 11/1/2019 2:56:07 PM | P | PASS |
|
|
Grid ceiling Phone #: ###-#### Inspection requested via web by Jim Williams Suspended ceiling in lobby and dining area only ok to cover
|
ELE19-02435
| Final | 11/1/2019 | 11/1/2019 | 11/1/2019 2:06:59 PM | P | FAIL |
|
|
For access please call Terry 1/2 hr prior to inspection ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott 210.8 All reseptacles located within 6' of a sink shall be GFCI protected 110.25 lockable disc for all hard wired appliances(cooktop,oven,dishwasher,micro)
|
ELE19-02468
| Final | 10/31/2019 | 11/1/2019 | 11/1/2019 1:37:52 PM | P | PASS |
|
|
Call Jeremy 1st please Phone #: ###-#### Inspection requested via web by Ryan Wake Final ok-Occ card signed
|
ELE19-04187
| Electrical Rough-In | 10/30/2019 | 11/1/2019 | 11/1/2019 11:53:01 AM | A | PASS |
|
|
Electrical rough-in for HVAC upgrades. Must call number above before arrival for access to the site. Tight security for Airport Custom and Boarder Patrol Building. Phone #: ###-#### Inspection requested via web by Kevin Perez Electrical installed for Duct heaters and new service in equipment room ok to proceed...
|
ELE19-04186
| Temporary Service | 10/31/2019 | 11/1/2019 | 11/1/2019 11:31:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bonnie Page Wrong Address given on temp pole as per permit # and request t/s u/g n ok
|
ELE19-04199
| Electrical Rough-In | 10/31/2019 | 11/1/2019 | 11/1/2019 11:27:47 AM | A | PASS |
|
|
please call so i can get you in ###-#### eddy Phone #: ###-#### Inspection requested via web by Eddy Udry Bath and laundry by garage and minimal work fished in kitchen ok to cover
|
ELE19-03947
| Final | 10/31/2019 | 11/1/2019 | 11/1/2019 10:51:35 AM | A | PASS |
|
|
Homeowner has to take child to school at 9 AM, but will be home to let inspector in at all other times. Phone #: ###-#### Inspection requested via web by Sarah Schuller Solar Array final ok
|
ELE19-00982
| Final | 10/31/2019 | 11/1/2019 | 11/1/2019 10:19:41 AM | A | FAIL |
|
|
Ben Phone #: ###-#### 210.52 REceptacle required within 24" of a range in both directions 210.8 GFCI protection required for all bathroom receptacles(Master bath) 210.12 AFCI protection for bedrooms(excersize room has rods in closets) 110.25 Lockable means of Disc for all hard wired appliances(oven) open ground in back rooms Hall bath receptacle in-op next to GFCI BCO-no violation shall be retained Replace flex and receptacle in front of house
|
ELE19-03229
| Electrical Rough-In | 10/31/2019 | 11/1/2019 | 11/1/2019 9:52:23 AM | A | PASS |
|
|
CONTACT: MIKE MULVAHILL Ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden Ceiling ok to cover
|
ELE19-03907
| Rough-In Permanent Service | 10/31/2019 | 11/1/2019 | 10/31/2019 8:37:53 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk Inspection cancelled from web by: Alan Lusk
|