PLM99-03053
| Groundwork | 11/9/1999 | 11/10/1999 | 11/11/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 15:47:13. Contact: ###-####.
|
PLM99-03013
| Final | 11/9/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 15:25:15. Contact: ###-####.
|
PLM99-03206
| Final | 11/10/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | P | FAIL |
|
|
carolyn ###-#### reinspection #15 Run T & P drain to exterior full size, turn down with 90' with approval material.
|