BLD98-01955
| FIRE-Final Inspection | 11/5/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | A | PASS |
|
|
###-#### steven Occupancy approval.
|
BLD98-01956
| FIRE-Final Inspection | 11/5/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | A | PASS |
|
|
###-#### steven Occupancy approval.
|
BLD98-02894
| FIRE-Final Inspection | 11/8/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | A | FAIL |
|
|
wing #700 james ###-#### Corridor/area separation wall penetrations; no alarm???; exit signs; etc.etc.
|
FIR99-00521
| INSP-Sprinkler Rough-in/Hydro | 11/9/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 13:38:04. Contact: ###-####. Hydro and R/I ok.
|
BLD99-03365
| FIRE-Conference | 11/10/1999 | 11/10/1999 | 11/10/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 07:44:34. Contact: ###-####. Not a fire inspection.
|