Inspections for the day of: Wednesday, November 10, 1999.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02528 FIRE-Final Inspection11/10/199911/10/199911/15/1999 12:00:00 AMPFAIL
Dwayne, ###-#### - for Idaho Vale & Fitting (tenant) Fire extinguisher.
BLD98-01848 FIRE-Final Inspection11/5/199911/10/199911/10/1999 12:00:00 AMAPASS
###-#### steven Occupancy approval.
FIR99-00433 INSP-Sprinkler Rough-in/Hydro11/9/199911/10/199911/10/1999 12:00:00 AMAPART
todd ###-#### walk through Ok to cover bld. #1- must inspect tenting before cover.
BLD99-02420 FIRE-Conference11/9/199911/10/199911/10/1999 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/09/1999 at 09:50:55. Contact: ###-####. Set time for final on Friday 11/12/99.
FIR99-00346 INSP-Final Inspection11/9/199911/10/199911/10/1999 12:00:00 AMANR
BRIAN-- ###-#### FN INSP Contractor called to cancel- not ready.
BLD99-02129 FIRE-Final Inspection11/9/199911/10/199911/10/1999 12:00:00 AMAFAIL
jay ###-#### Exit signs.
BLD99-02142 FIRE-Final Inspection11/9/199911/10/199911/10/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/09/1999 at 16:07:04. Contact: . Occ. Approved.
BLD99-02442 FIRE-Sprinkler Rough-in11/10/199911/10/199911/10/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/10/1999 at 08:09:54. Contact: ###-####. Ok to cover.
FIR99-00495 INSP-Sprinkler Rough-in/Hydro11/10/199911/10/199911/10/1999 12:00:00 AMPPART
john ###-#### Hydro ok for area on first floor and elevator pit.
FIR99-00495 INSP-Sprinkler Rough-in11/10/199911/10/199911/10/1999 12:00:00 AMPPART
john ###-#### R/I ok at first floor lobby.
BLD99-01722 FIRE-Supply Line Cover11/9/199911/10/199911/10/1999 12:00:00 AMPPASS
shelly ###-#### ok to cover (not CPVC pipe).
BLD99-01712 FIRE-Supply Line Cover11/9/199911/10/199911/10/1999 12:00:00 AMPPASS
shelly ok to cover (not CPVC pipe).
BLD99-01860 FIRE-Final Inspection11/9/199911/10/199911/10/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/09/1999 at 15:18:02. Contact: ###-####. Not a fire inspection.
BLD99-03113 FIRE-Sprinkler Rough-in11/9/199911/10/199911/10/1999 12:00:00 AMPPART
MARK--- ###-#### CELL FIRE R/I not a sprinkler R/I; contractor will submit alarm plans to indicate possible changes in auditorium.
BLD98-03679 FIRE-Sprinkler Rough-in11/10/199911/10/199911/10/1999 12:00:00 AMPPART
ron-- ###-#### r/I Ok to cover area by elevator.
FIR99-00521 INSP-Final Inspection11/10/199911/10/199911/10/1999 12:00:00 AMPPASS
All items complete per plan
BLD99-02129 FIRE-Final Inspection11/10/199911/10/199911/10/1999 12:00:00 AMPPASS
Occ. approved