Inspections for the day of: Thursday, November 10, 2005.
Number of inspections: 37
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00080 INSP-Final Inspection11/10/200511/10/200511/14/2005 1:47:50 PMPPASS
Fire alarm permit finaled
BLD04-01324 FIRE-Final Inspection11/9/200511/10/200511/10/2005 5:10:34 PMAPART
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include adding an emergency light in the west projector room and installing the fire extinguishers. The fire alarm and fire sprinkler permits need finalling as well.
BLD05-00922 FIRE-Final Inspection11/9/200511/10/200511/10/2005 5:01:38 PMAPART
A temporary occupancy was given with Dave Hanniman's permission. An additional emergency light needs to be added in the west projector room and fire extinguishers installed. Per contractor these items will be completed by the evening of 11-11-05. The fire alarm and fire sprinkler permits need to be finaled.
BLD05-01900 FIRE-Final Inspection11/9/200511/10/200511/10/2005 4:37:03 PMACANC
no time for inspection
BLD05-02573 FIRE-Final Inspection11/9/200511/10/200511/10/2005 4:36:10 PMACANC
no time for inspection
FIR05-00661 INSP-Final Inspection11/9/200511/10/200511/10/2005 4:35:36 PMACANC
no time for inspection
BLD05-01624 FIRE-Final Inspection11/9/200511/10/200511/10/2005 4:35:11 PMACANC
no time for inspection
FIR05-00523 INSP-Sprinkler Rough-in11/9/200511/10/200511/10/2005 2:34:41 PMACANC
no time for inspection
FIR05-00626 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:34:13 PMACANC
no time for inspection
FIR05-00523 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:33:21 PMACANC
no time for inspection
FIR05-00660 INSP-Supply line flush11/10/200511/10/200511/10/2005 2:32:11 PMPCANC
no time for inspection
FIR05-00591 INSP-Final Inspection11/3/200511/10/200511/10/2005 2:31:00 PMPCANC
no time for inspection
FIR05-00592 INSP-Final Inspection11/3/200511/10/200511/10/2005 2:30:47 PMPCANC
no time for inspection
FIR05-00670 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:29:46 PMPCANC
no time for inspection
FIR05-00639 INSP-Final Inspection11/10/200511/10/200511/10/2005 2:28:25 PMPCANC
No time for inspection
BLD05-01926 FIRE-Final Inspection11/10/200511/10/200511/10/2005 2:27:36 PMPCANC
No time for inspection
BLD05-02318 FIRE-Final Inspection11/10/200511/10/200511/10/2005 2:27:19 PMPCANC
No time for inspection
BLD05-01767 FIRE-Final Inspection11/9/200511/10/200511/10/2005 2:26:43 PMPCANC
Contractor had problems with the smoke evac system. No inspection done.
FIR05-00326 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:20:39 PMPCANC
no time for inspection
FIR05-00266 INSP-Sprinkler Rough-in/Hydro11/9/200511/10/200511/10/2005 2:19:56 PMPCANC
No time for inspection
FIR05-00749 INSP-Final Inspection11/10/200511/10/200511/10/2005 2:16:50 PMPCANC
no time for inspection
FIR05-00480 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:15:38 PMACANC
No time for inspection
FIR05-00519 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:14:12 PMAPASS
Permit finaled
FIR05-00080 INSP-Alarm Testing11/9/200511/10/200511/10/2005 2:03:47 PMAPASS
Fire alarm finaled
FIR05-00489 INSP-Final Inspection11/4/200511/10/200511/10/2005 2:03:19 PMAFAIL
Approved plans indicated 1 1/2" branchlines. Real life they are 1 1/4". Need to resubmit plans for actual pipe size approval.
FIR05-00488 INSP-Alarm Testing11/4/200511/10/200511/10/2005 2:02:06 PMAPASS
Fire alarm finaled
BLD05-00672 FIRE-Final Inspection11/9/200511/10/200511/10/2005 2:01:26 PMACANC
Scheduled by a contractor via Hello! on 11/9/2005 at 4:07:12 PM. Contact: ###-####.
FIR05-00528 INSP-Final Inspection11/9/200511/10/200511/10/2005 2:00:58 PMAFAIL
Resubmittals not approved yet. No inspection performed.
FIR05-00488 INSP-Final Inspection11/10/200511/10/200511/10/2005 1:51:23 PMPPASS
Permit finaled
BLD04-02767 FIRE-Final Inspection11/9/200511/10/200511/10/2005 1:44:10 PMAFAIL
don; Phone #: ###-####
Need fire alarm finaled and the two fire doors remotes removed and the manual locks/pins removed from the double swinging doors.
FIR05-00210 INSP-Alarm Testing11/9/200511/10/200511/10/2005 1:42:53 PMAFAIL
Pull stations are mounted too high, duct smoke detectors do not shut down the units and the remote annunciators don't work. Several duct detectors are mounted incorrectly and the sample tubes are incorrectly orientated. The strobes in the coolers and freezers need the listed backboxes to be installed which is part number WBB from System Sensor.
FIR04-00743 INSP-Final Inspection11/9/200511/10/200511/10/2005 9:13:17 AMAPASS
Permit finaled
FIR04-00750 INSP-Final Inspection11/9/200511/10/200511/10/2005 9:12:49 AMAPASS
Permit finaled
FIR05-00459 INSP-Final Inspection11/10/200511/10/200511/10/2005 12:00:00 AMPPART
A temporary occupancy was given with Dave Hanniman's permission until resubmittals and elevator are finished and finaled. Elevator is not to be used until inspected.
FIR05-00076 INSP-Final Inspection11/10/200511/10/200511/10/2005 12:00:00 AMPPART
A temporary occupancy was given with Dave Hanniman's permission until resubmittals and elevator are finished and finaled. Elevator is not to be used until inspected.
FIR05-00372 INSP-Final Inspection11/10/200511/10/200511/10/2005 12:00:00 AMPPART
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.
FIR05-00344 INSP-Final Inspection11/10/200511/10/200511/10/2005 12:00:00 AMPPART
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.