FIR05-00080
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/14/2005 1:47:50 PM | P | PASS |
|
|
Fire alarm permit finaled
|
BLD04-01324
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 5:10:34 PM | A | PART |
|
|
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include adding an emergency light in the west projector room and installing the fire extinguishers. The fire alarm and fire sprinkler permits need finalling as well.
|
BLD05-00922
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 5:01:38 PM | A | PART |
|
|
A temporary occupancy was given with Dave Hanniman's permission. An additional emergency light needs to be added in the west projector room and fire extinguishers installed. Per contractor these items will be completed by the evening of 11-11-05. The fire alarm and fire sprinkler permits need to be finaled.
|
BLD05-01900
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 4:37:03 PM | A | CANC |
|
|
no time for inspection
|
BLD05-02573
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 4:36:10 PM | A | CANC |
|
|
no time for inspection
|
FIR05-00661
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 4:35:36 PM | A | CANC |
|
|
no time for inspection
|
BLD05-01624
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 4:35:11 PM | A | CANC |
|
|
no time for inspection
|
FIR05-00523
| INSP-Sprinkler Rough-in | 11/9/2005 | 11/10/2005 | 11/10/2005 2:34:41 PM | A | CANC |
|
|
no time for inspection
|
FIR05-00626
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:34:13 PM | A | CANC |
|
|
no time for inspection
|
FIR05-00523
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:33:21 PM | A | CANC |
|
|
no time for inspection
|
FIR05-00660
| INSP-Supply line flush | 11/10/2005 | 11/10/2005 | 11/10/2005 2:32:11 PM | P | CANC |
|
|
no time for inspection
|
FIR05-00591
| INSP-Final Inspection | 11/3/2005 | 11/10/2005 | 11/10/2005 2:31:00 PM | P | CANC |
|
|
no time for inspection
|
FIR05-00592
| INSP-Final Inspection | 11/3/2005 | 11/10/2005 | 11/10/2005 2:30:47 PM | P | CANC |
|
|
no time for inspection
|
FIR05-00670
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:29:46 PM | P | CANC |
|
|
no time for inspection
|
FIR05-00639
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 2:28:25 PM | P | CANC |
|
|
No time for inspection
|
BLD05-01926
| FIRE-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 2:27:36 PM | P | CANC |
|
|
No time for inspection
|
BLD05-02318
| FIRE-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 2:27:19 PM | P | CANC |
|
|
No time for inspection
|
BLD05-01767
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:26:43 PM | P | CANC |
|
|
Contractor had problems with the smoke evac system. No inspection done.
|
FIR05-00326
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:20:39 PM | P | CANC |
|
|
no time for inspection
|
FIR05-00266
| INSP-Sprinkler Rough-in/Hydro | 11/9/2005 | 11/10/2005 | 11/10/2005 2:19:56 PM | P | CANC |
|
|
No time for inspection
|
FIR05-00749
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 2:16:50 PM | P | CANC |
|
|
no time for inspection
|
FIR05-00480
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:15:38 PM | A | CANC |
|
|
No time for inspection
|
FIR05-00519
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:14:12 PM | A | PASS |
|
|
Permit finaled
|
FIR05-00080
| INSP-Alarm Testing | 11/9/2005 | 11/10/2005 | 11/10/2005 2:03:47 PM | A | PASS |
|
|
Fire alarm finaled
|
FIR05-00489
| INSP-Final Inspection | 11/4/2005 | 11/10/2005 | 11/10/2005 2:03:19 PM | A | FAIL |
|
|
Approved plans indicated 1 1/2" branchlines. Real life they are 1 1/4". Need to resubmit plans for actual pipe size approval.
|
FIR05-00488
| INSP-Alarm Testing | 11/4/2005 | 11/10/2005 | 11/10/2005 2:02:06 PM | A | PASS |
|
|
Fire alarm finaled
|
BLD05-00672
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:01:26 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 11/9/2005 at 4:07:12 PM. Contact: ###-####.
|
FIR05-00528
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 2:00:58 PM | A | FAIL |
|
|
Resubmittals not approved yet. No inspection performed.
|
FIR05-00488
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 1:51:23 PM | P | PASS |
|
|
Permit finaled
|
BLD04-02767
| FIRE-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 1:44:10 PM | A | FAIL |
|
|
don; Phone #: ###-#### Need fire alarm finaled and the two fire doors remotes removed and the manual locks/pins removed from the double swinging doors.
|
FIR05-00210
| INSP-Alarm Testing | 11/9/2005 | 11/10/2005 | 11/10/2005 1:42:53 PM | A | FAIL |
|
|
Pull stations are mounted too high, duct smoke detectors do not shut down the units and the remote annunciators don't work. Several duct detectors are mounted incorrectly and the sample tubes are incorrectly orientated. The strobes in the coolers and freezers need the listed backboxes to be installed which is part number WBB from System Sensor.
|
FIR04-00743
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 9:13:17 AM | A | PASS |
|
|
Permit finaled
|
FIR04-00750
| INSP-Final Inspection | 11/9/2005 | 11/10/2005 | 11/10/2005 9:12:49 AM | A | PASS |
|
|
Permit finaled
|
FIR05-00459
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with Dave Hanniman's permission until resubmittals and elevator are finished and finaled. Elevator is not to be used until inspected.
|
FIR05-00076
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with Dave Hanniman's permission until resubmittals and elevator are finished and finaled. Elevator is not to be used until inspected.
|
FIR05-00372
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.
|
FIR05-00344
| INSP-Final Inspection | 11/10/2005 | 11/10/2005 | 11/10/2005 12:00:00 AM | P | PART |
|
|
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.
|